Tax 2012C-CS130430 ■ r- 7 t .' Gt. I rr/L l___,. - _- Client: City of Coppell ERa N ITY Project Name: Southern Belle Drive Reconstruction „,„„„for„,,,,,,,„,n, Project Manager: Kevin Shepherd Date Prepared: 4/25/13(90%Submittal) - , - - , • ■ • PROB. : •- -m No. Description Units Quantity Unit Price Item cost '0 Mobilization LS 1 $15,000 $15,000 10 Preparation of Right-of-Way(complete) LS 1 $7,000 ,000 102 For unclassified street excavation CY 1,280 , $3 $3,200 103 -move existing inlet EA 2 $1,000 $2,000 104 Re •ve existing storm sewer pipe LF 105 $100 $10,500 105 Furnish : d install 8-inch lime treated subgrade SY 3,200 $ $15,998 106 Furnish an. •lace hydrated lime, (42#/SY) TON 67 35 $9,071 107 Furnish and ins : I 6-inch portland cement concrete SY 2,966 $40 $118,640 108 Construct concrete . 've SY 300 $32 $9,589 109 6-inch monolithic conc : -curb LF 1,5 $2 $3,147 110 Construct 4-inch reinforce. ••ncrete sidewalk SY 40 $25 $18,500 ,, • ...u...� Lr as b 4i4/b ENGINEER'S OPINION OF PROBABLE COST $ 395,501 CONTINGENCY(10%) $ 39,550 TOTAL WITH CONTINGENCY $ 435,052 7 - Va 1 - [ Y E> I Tf 4. C— 7i, Z14- "-cam r.