Tax 2012A-CN130430
ALLIANCE ' *TECHNICAL_ • GEOTECHNICAL ENGINEERING GROUP • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS ENGINEERING AND TESTING April 25, 2013 Mr. Keith Marvin, P.E. Phn: (972) 304-3562 Civil Engineer Email: kmarvin @coppelltx.gov City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Re: Mockingbird Reconstruction Coppell, Texas Engineering Inspection &Testing Services AGG Proposal No: P13-0428C Dear Mr. Marvin: Alliance Geotechnical Group (AGG) is pleased to confirm our firm's interest in providing materials inspection and testing services for the proposed Mockingbird Reconstruction project noted above. A schedule of unit fees for this project is attached. After reviewing our fee schedule if you have any questions, please contact the undersigned at (972)444-8889. If acceptable, please sign below and fax back to our office as our Authorization to Proceed. We look forward to the opportunity of working with you on this project. Respectfully submitted, ALLIANCE GEOTECHNICAL GROUP 474/2zulztJ Perry Kakara, S.E.T. y Robert P. Nance CME Department Manager President Approved by: Date: _3d ,C_J gna ure MEMBER 3228 Halifax Street • Dallas, Texas 75247 \E_,IL Tel: 972-444-8889 • Fax: 972.444-8893 • www.aggengr.com SCHEDULE OF FEES FOR CONSTRUCTION MATERIALS ENGINEERING &TESTING MOCKINGBIRD RECONSTRUCTION COPPELL, TEXAS AGG PROPOSAL NO.: P13-0428C DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE A. SUBGRADE TESTING & INSPECTION • Moisture/Density Relationship of Soils (ASTM D-698) 4 @ $150.00 each $600.00 • Atterberg Limits 4 @ $50.00 each $200.00 • Lime Series ( 5 point PI method) 4 © $225.00 each $900.00 • Cement Series ( as needed ) 0 © $375.00 each $0.00 • Sulfate Test 4 © $90.00 each $360.00 • Driveway Subgrade Density Test( 1 per driveway) 4 @ $13.00 each $52.00 • Sidewalk Density Tests( 1 per 300 If) 18 @ $13.00 each $234.00 • Barrier Ramp Density Tests ( 1 per ramp) 12 @ $13.00 each $156.00 • Lime Gradation Test(1 per 300 If) 24 @ $13.00 each $312.00 • Lime Depth Verification (1 per 300 If) 24 @ $13.00 each $312.00 • Lime Subgrade In-Place Density Test(1 per 300 If) 24 © $13.00 each $312.00 • Retaining Wall Backfill Density Test(1 per lift) 10 @ $13.00 each $130.00 • Sr. Engineering Tech to perform testing 97 @ $37.00 hour $3,589.00 • Project Manager 7 @ $75.00 hour $525.00 • Geotechnical Project Manager( as needed ) 0 @ $90.00 hour $0.00 • Sr. Geotechnical Engineer( as needed ) 0 © $110.00 hour $0.00 • Vehicle Charge 32 @ $35.00 trip $1,120.00 Sub-Total $8,802.00 B. UTILITY BACKFILL TESTING & INSPECTION • Moisture/Density Relationship of Soils(ASTM D-698) 4 @ $150.00 each $600.00 • Atterberg Limits 4 @ $50.00 each $200.00 • Sieve Analysis for Embedment 3 @ $35.00 each $105.00 • In-Place Density Test"(ASTM D2922) 110 @ $13.00 each $1,430.00 • Concrete Test Cylinders (4 cyls per set) inlets,manholes 8 @ $14.00 each $112.00 • Sr. Engineering Tech to perform testing 90 @ $37.00 hour $3,330.00 • Project Manager 8 @ $75.00 hour $600.00 • Vehicle Charge 19 @ $35.00 trip $665.00 Sub-Total $7,042.00 P13-0428C . SCHEDULE OF FEES FOR CONSTRUCTION MATERIALS ENGINEERING &TESTING MOCKINGBIRD RECONSTRUCTION COPPELL,TEXAS AGG PROPOSAL NO.: P13-0428C DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE C. CONCRETE & REINFORCING TESTING & INSPECTION • Concrete Inspection &Testing (regular time) 120 © $37.00 hour $4,440.00 • Concrete Cylinder Test-(4 cyls per 100 cyd ) - Paving 88 @ $14.00 each $1,232.00 • Concrete Cylinder Test-(4 cyls )- Retaining Wall 8 © $14.00 each $112.00 • Concrete Cylinder Test-(4 cyls per 100 cyd )-Sidewalk 32 @ $14.00 each $448.00 • Concrete Cylinder Test-(4 cyls per 100 cyd )- Driveways 16 @ $14.00 each $224.00 • Concrete Cylinder Test-(4 cyls per 100 cyd )-Barrie ramps 24 @ $14.00 each $336.00 • Concrete Core Depth Checks ( 2"dia core/300 If) 7 @ $40.00 each $280.00 • Project Manager 10 @ $75.00 hour $750.00 • Vehicle Charge 30 @ $35.00 trip $1,050.00 Sub-Total $8,872.00 ESTIMATED TOTAL $24,716.00 NOTES: 1. Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked over eight(8) hours per day Monday thru Friday or any time before 7:00 a.m. or after 5:00 p.m. Service performed on Saturdays and Sundays will be billed at 1.5 times the regular hourly rate. Services performed on recognized holidays will be billed at 2.0 times the regular hourly rate. (WILL BE BILLED TO CONTRACTOR) 2. All laboratory test fees are F.O.B. our laboratory; additional charge for sample pickup may apply. 3. Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal-to-portal. 4. Additional test not specified in this proposal will be quoted upon request. 5. This proposal does not include any technician stand-by, non-readiness charges, and/or trips or re-tests of the previous failing tests. • 6. The above unit rates are based on the following estimated schedule: * Concrete paving- 10 placements estimated • * Concrete sidewalk -8 placements estimated * Barrier free ramps - 3 placements estimated * Concrete driveways-3 placements estimated * Concrete Cores-2 placements estimated * Retaining Wall -2 placements estimated * Lime subgrade- 16 estimated site visits * Sidewalk subgrade- 8 estimated site visits * Driveway subgrade - 3 estimated site visits * Barrier free ramp subgrade-2 estimated site visits * Site utilities - 13 estimated site visits P13-0428C