Loading...
Carter Addn 3-CS130507 Rhonda Adloo Subject:Walk-thru inspection for Carter Addition, Phase III Location:North of Belt Line, West of Moore Rd off Christi Dr Start:Thu 5/9/2013 9:00 AM End:Thu 5/9/2013 10:30 AM Show Time As:Tentative Recurrence:(none) Meeting Status:Not yet responded Organizer:Rhonda Adloo Required Attendees:George Marshall (gmarshall@coppelltx.gov); Michael Corder; Debbie Taber; Tim Oates; jpapagolos@pd-company.com; cross@daa-civil.com; gmidkiff@gmconstructiontx.com; trey@cwyoung.com; David Malone; Alberto Samaniego Final walk-thru for paving, utilities and drainage; contact Albert Samaniego at 469-576-1458 if you have questions. 1 T H E C 1 T Y O F COPPELL T � � �0 X A s s MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: George Marshall,P.E.,Traffic Engineer Streets Dept. Utility Dept. Tim Oates,Deputy Chief/Prevention From: Albert Samaniego, Construction Inspector Office Phone: (972)304-3685 Fax: (972)304-3570 Date: May 7,2013 RE: WALK-THRU INSPECTION for Carter Addition,Phase III A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: Thursday, May 9, 2013 at 9:00 a.m. Please let me know if I can be of further assistance. cc: John Papagolos, fax# 972-931-2660 Casey Ross, Dowdey Anderson & Assoc "CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN"