CF-Andrew Park 1-CN 920211 ., Cons lderat ~dapprova
'.;' ~ ?(~..~ la nd s cape archltecturalt
','amount :of $99'}960,"00
[:'ahd.,.aUthOrizing the~.?Ma;
With :...Me s a,i!,D e s lgn'~, Grou'
vinit~i:a% ~
· ~6n' ems
SUBMITTED' BY:
' '!.l'h~d s'~'ap e 3 arCh ite c tuta
coPpe 11 ' communityj;?ark';
fu~ds , f~om ',!al ~gr'ah~i~ibY~
· D~nati'$n
T~s 7,
~ipa'rks
~,speciaY
(reg
:-~,, Community ~Park :~have i~been: addressed ~%by. Mesa,.~Des~gn .s
Work'b, ,kibert'i?iHa'lff &~i?A~:S°ciates~,~o~'C°mpl'ete hydroI°(
'ssues?
whi6h,:~includeSi,..
,fi
fj 1599
BUDGET
PROPOSAL FOR PROFESSIONAL SERVICES:
Date: January 31, 1992
Landscape Architecture
Land Planning
Intenors
Datla,s, lexas 75204
214/~} ~ 1
MESA
DESIGN GROUP
To:
Steve Goram
Public Works Director
City of Coppell
732 DeForest Street
Coppell, Texas 75019
Project: COMMUNITY PARK PHASE I IMPROVEMENTS
This letter of proposal describes planning and landscape architectural
services to be provided by MESA Design Group, Inc., costs of these services
and general conditions under which those services would be executed.
SCOPE OF SERVICES
MESA Design Group, 'Inc., will provide the following planning and
landscape architectural services for the Community Park Phase I
Improvements:
A. DATA COLLECTION REIMBURSABLES
1. Aerial Topography
Topographic Mappiug = Aerial mapping of the entire park site
will be provided in reproducible format for a base map and in
digital format for use on a CADD system. This will facilitate the
preparation for the Basic Hydraulic Study, as well as, provide
updated topographic information for design and planning of the
site. A brief review of the 1989 cross sections provided by your
office shows significant changes since the 1985 city topography,
especially in the area of the east lake. Therefore, revisions to the
cross sections in the hydraulic models will be required to evaluate
the characteristics of the proposed park improvements.
Field Survey of Topography and Trees in Areas of Parking,
Restroom and Playground
In addition, a detailed survey will be provided for the Phase I
parking lot/restroom area (6 acres). This survey will include
verification of the aerial topography and location and
identification of all trees.
3. Soil Tests
The Consultant will procure six soil borings on the site in order
to provide geotechnical design data for structural improvements
and lake construction.
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE THREE
4. Final Recommendations and Presentation
ao
Recommendations - Recommendations will be provided in
a brief letter report and a representative from Halff
Associates will be available for meetings and presentations
to Coppell Public Works Department, the Park Board and
the City Council, as required. Changes to the proposed plan
as a result of these meetings and presentations will be
incorporated into the HEC-2 model and interior drainage
schematic and the Master Grading Plan will be reviewed
and corrections/changes recommended.
Permitting
Permit Approvals - Hydraulic models will be prepared for
the final park plan and submitted to the applicable federal,
state and city departments. The complete report on the
hydraulic study will be provided to the City of Coppell,
FEMA, and C.O.E. A conditional letter of map revision
(LOMR) will be obtained from the
Federal Emergency Management Agency (FEMA). A final
LOMR may be obtained at the completion of all park
improvements. Please note that the final LOMR is not
included in this contract.
A wetland determination and submittal to the COE for a
404 permit is also included. The master grading plan will
be utilized as the wetlands mitigation plan. The Consultants
feel that this project will qualify under the nationwide
permit criteria since the east lake is being increased in size.
Therefore, the scope of services provided covers the
permitting only. Preparation of a CDC (Corridor
Development Certificate) application will be investigated
and prepared if necessary. New federal regulations also
require construction projects affecting over 5 acres to
obtain an NPDES storm water construction permit. The
current regulations require that the contractor obtain this
permit. The Consultant will coordinate this effort.
C. CONSTRUCTION DOCUMENTS
MESA Design Group will prepare construction documents in
accordance with the intent of the Phase One construction anticipated
by the TPWD Grant. These documents will include plans, details and
specifications entered for bid purposes. These documents shall cover
the following construction items:
1. Landscape and Irrigation Plans
a. Parking Lot/Restroom Area
b. Residential screening buffer of Parking
c. Baseball Fields
d. Turf and Temporary Irrigation in remainder of park.
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE FOUR
Site Grading/Structures
Final construction documents of site grading of Phase One will be
prepared in accordance with the hydraulic models prepared. This
includes lake and baseball field grading, extensions of off site
drainage flumes from the Parkview Subdivision into the lake
and onsite area drains if required. Design of a new lake outflow
structure, dam and permanent erosion control is not included as
a basic service (see "Optional Services"). In addition design of
detention ponds for erosion control is not included.
The proposed rule for NPDES storm water construction permits
requires detention if the disturbed area is greater than 10 acres.
The final rule should be published in early 1992. As specified
under the permit tasks, the contractor would be required to
obtain this permit. However, design and installation of the
detention structure could increase the cost of this project.
Parking Lot
a. 120 Car parking spaces
b. Access road off Parkway Boulevard
4. Amenities Layout/Details
o
a. Overall Site Layout Plans
b. Playground site preparation (Playground Equipment N.I.C.)
c. Multi-Use Court
d. Hike and Bike Trail
e. Fishing/Boat Dock
f. Picnic facilities
g. Handicap access
h. Bridge(s) as required
i. Park Signage/TPWD Signage
j. Parking Lot Lighting
Baseball Field Complex (3)
a. 3-220' Homerun fields
b. Access walks, backstops, bleachers (as budget allows)
c. Multi-purpose fields in outfields
d. 1 Field as alternate
e. Irrigation
(Lighting is not included)
Restroom Building
a. Architectural Design
b. Structural Design
c. Mechanical, Electrical, Plumbing Design
7. Specifications and Bidding Documents
MESA Design Group will coordinate all consultants and prepare
final bid documents for public bid.
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE FIVE
Do
Eo
MEETINGS, REVIEW AND PRESENTATIONS
MESA will be available for meetings, presentations and reviews
during the hydrology evaluation and preparation for construction
documents as follows:
1. City Council Meetings (2)
2. Park Board Meetings (4)
3. Texas Parks and Wildlife review and coordination as
required
4. City of Coppell Building Inspection Department and
Engineering Department review and approval as required
BIDDING
MESA will assist the City of Coppell with letters to prospective
bidders, pre-bid conference, clarifications to contractors,
tabulation and review of bids, and presentation to the Park Board.
F. CONTRACT ADMINISTRATION/CONSTRUCTION OBSERVATION
MESA will provide assistance during the construction phase as follows:
I. Assistance with bidding and negotiation as required
2. Pre-construction meetings as required with Owner's
representative, General Contractor, Landscape and Irrigation
Contractors
3. Tree tagging and approval of plant material as necessary
4. Site reviews and punch outs as required
5. Approval and verification of invoices
The City of Coppell will provide inspection services for mechanical,
structural and architectural items during the construction period. In
addition, City of Coppell will provide a project manager from public
works for general project supervision
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE SIX
COST OF SERVICES
A. DATA COLLECTION REIMBURSABLES
TASK,
HOURLY NOT TO
EXCEED BASIS
1. Aerial Topography of Entire Site
a. Control
b. Mapping
c. Review and Site Map Preparation
2. Topography and Tree Survey of
Phase 1 Parking/Playground ( 6 ac.)
$ 5,615
$ 1,742
1. Spot Check Aerial Topography
2. Identify and Locate Significant Trees
3. Plot Trees and Spot Elevations on
Topographic Maps
Soil Testing
$ 2,280
SUBTOTAL DATA COLLECTION
B. HYDROLOGY AND HYDRAULICS
1. Conceptual Grading Plan
$ 2,500
Hydrology and Hydraulics
a. Data Collection
1. City Drainage Studies/Plans/Utilities
2. Gage Data at SH 121
3. Grapevine Lake Operating Policies
4. Existing Survey Data
5. Field Reconnaissance
$ 825
bo
Revise Existing Hydraulic Model $ 1,672
(Additional Detail)
1. Insert New Cross Sections (New Topography)
2. Debug HEC2 Model
3. Flood Plain Delineation (2- & 100-year)
Develop Flow Duration Data $ 1,650
1. Input Data
2. Analyze Flooding Durations
3. Analyze Water Surface Elevations (HEC-2)
4. Recommended Fill Elevations
Proposed Condition Hydraulic Model $ 2,607
I. Insert Park Improvements
2. Debug HEC2 Model
3. Evaluate Improvements
a. City Criteria
b. COE/EPA Criteria
c. FEMA Criteria
4. Model Other Alternatives (if required)
$9,637
3. Interior Drainage Study $ 3,548
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE SEVEN
TASK
HOURLY NOT TO
EXCEED BASIS.
Final
a.
b.
Co
Recommendations and Presentations
Letter Report
Meetings/Presentations
1. Coppell Parks Department/Board (1)
2. Coppell Engineering (1)
3. Coppell City Council (1)
Final Park Improvement Plan
1. Model Changes to Plan
2. Corrections to Master Grading Plan
$ 825
$ 2,145
$ 1,045
Permit Preparation/Approvals
a. City of Coppell
b. FEMA
c. COE/EPA 404 Permit 1. Initial Site Visit
2. Preliminary Wetland Delineation
3. Mitigation Plan (Utilizing Master Grading Plan
by Mesa Design)
$ 990
$ 880
$ 2,051
4. COE Submittal - Determination (National Permit)
d. CDC (Corridor Development Certificate) Application
if Necessary
e. NPDES Permit (erosion control) Coordination Only $ 352
Contractor will be required to prepare and submit this permit
SUBTOTAL - HYDROLOGY AND HYDRAULICS
C. PHASE ONE CONSTRUCTION DOCUMENTS
1. MESA Design Group, Inc.
a. Landscape/Irrigation
b. Site Grading
c. Parking Lot
d. Amenities Layout/Details
e. Baseball Fields (3)
f. Specifications/Bid Documents
2. Consultants
a. Architectural Design
1. Restroom
$ 3,500
$ 5,5OO
$ 5,500
$ 7,500
$ 9,000
$ 3,OOO
$ 3,300
$21,090
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE EIGHT
TASK
HOURLY NOT TO
EXCEED BASTS
b. Structural Engineering $ 3,800
1. Amenities
2. Restroom
3. One field review
c. Mechanical Engineering $ 3,910
1. Restroom
2. Parking Lot Lighting/Electrical
3. One field review
d. Civil Engineering
a. Utility Extensions/Fire plug $ 6,473
b. On and off site drainage structures
c. One field review
SUBTOTAL CONSTRUCTION DOCUMENTS
$51,483
D. BIDDING $ 3,000
SUBTOTAL BIDDING
CONTRACT ADMINiSTRATION/CONSTRUCTION OBSERVATION
The scope of this proposal includes nine months of construction
observation.
1. MESA Design Group, Inc. $10,500
(Six hours per week for 36 weeks)
$ 3,000
SUBTOTAL CA/CO $10,500
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE NINE
TASK
TOTAL BASIC SERVICES
F. REIMBURSABLES
1. General Reimbursables Allowance
(See Conditions Item E)
a. Mylars and Miscellaneous Printing
b. Delivery Fees
c. Mileage
d. Other
Bidding Printing (12 sets @ $150)
Advertisement
Permit Allowance
$1,000
$3O0
$750
$450
COE/EPA 404 Permit
(if nationwide permit not approved)
1. Pre-Application Site Visit
2. 404 Permit Application
Estimates of Known Permit Fees (Estimated)
1. FEMA Letter of Map Revision
2. COE (404)
3. NPDES
4. City Plan Review Fees
HOURLY NOT TO
EXCEED BASIS
$95,710
$2,500
$1,750
SN.I.C.
-0-
$0.00
$0.00
$0.00
(As of November 1991)
$ 0.00
$ 0.00
(As of November 1991)
$0.00
SUBTOTAL REIMBURSABLES
$ 4,250
TOTAL FEE PROPOSAL
$99,960
HOURLY RATE SCHEDULE:
Principal $75.00
Associate $55.00
Project Manager $42.50
Architect/Technician $35.00
CAAD Operator $55.00
Clerical $25.00
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE ELEVEN
Go
D. MESA Design Group, Inc. may subcontract consultants in the
performance of any services described in this agreement.
Eo
MESA Design Group, Inc. does not act as General Contractor in
any way, or accept responsibility for poor craftsmanship.
The above described compensation for MESA Design Group, Inc.
does not include the following non-labor costs:
I. Photostats or photocopying
2. Binding
3. Printing
4. Photography
5. Mylars
6. Delivery Fees
7. Mailing
8. Drawings not described in the Scope of Services
9. Blue printing, printing or binding for bidding purposes
I0. Long distance telephone calls
Il. Mileage @ .27
12. Travel expenses
13. Other products and services requested by the Client and not
specifically described herein
14. Facsimile
There will be a 10% Administrative Fee for all reimbursable
expenses to compensate for bookkeeping.
Compensation for all services shall be paid in Dallas, Dallas
County, Texas.
Payment Schedule: Billing will be on a design progress basis at
the end of each month.
Insurance requirements: Consultant shall procure, pay for, and
maintain during the term of this contract, with a company
authorized to do business in the state of Texas, and acceptable to
city, the minimum insurance coverage contained in Exhibit 'C'
attached to and made part of this contract.
Indemnity: Consultant shall defend, indemnify, and hold City
whole and harmless against any and all claims for damages, costs,
and expenses to persons or property that may arise out of, or be
occasioned by or from any negligent act, error, or omission of
consultant or any agent, servant, or employee of consultant in the
execution or performance of this contract.
PROPOSAL FOR COMMUNITY PARK PHASE I
PAGE TWELVE
Submitted by:
MESA DESIGN GROUP, INC.
William T. Arterburn
Principal
City of Coppell
Return Copy Enclosed
Phone: (214) 462-8495
Date: