ST9904-CS130204 Air Texas Department of Transportation
P.O. BOX 133067• DALLAS,TEXAS 75313-3067• (214) 320-6100
February 4, 2013
Roadway Illumination
Control: 0364-2-17
SH 121: From: %4 mile south of Freeport Pkwy
To: Denton Creek
City of Coppell
Denton County
Mr. Ken Griffen, P.E.
Director of Engineering
City of Coppell
PO Box 9478
Coppell, TX 75019
Dear Mr. Griffen:
As you are aware, TxDOT will be installing continuous lighting along SH 121 as part of the
above subject project. The maintenance and operation lighting responsibilities will be
shared by the cities of Grapevine and Coppell. These responsibilities will be divided on a
north/south line rather than along the centerline of the roadway. Coppell will be responsible
for the northern section of the roadway. A copy of the lighting plans is attached for your
reference. TxDOT will supply to the city a drill motor for lowering and raising the light ring at
the completion of the project.
Please find attached two (2) original Agreements for Construction, Maintenance and
Operation of Continuous Highway Lighting Systems within a Municipality for your review and
approval. If all is satisfactory, please obtain authorized signatures on both originals and
return to me for further processing. A fully executed original will be returned to you for your
files and use.
If you have any questions, please feel free to contact me at 214-320-6229 or Angela Green
at 214-320-4432, if needed.
Sincer-ly
Melanie B. Yr, ng, 4 .
District Tran'.o ion Operations Engineer
Attachments
THE TEXAS PLAN
REDUCE CONGESTION•ENHANCE SAFETY•EXPAND ECONOMIC OPPORTUNITY•IMPROVE AIR QUALITY
PRESERVE THE VALUE OF TRANSPORTATION ASSETS
An Equal Opportunity Employer