Loading...
ST9904-CS130204 Air Texas Department of Transportation P.O. BOX 133067• DALLAS,TEXAS 75313-3067• (214) 320-6100 February 4, 2013 Roadway Illumination Control: 0364-2-17 SH 121: From: %4 mile south of Freeport Pkwy To: Denton Creek City of Coppell Denton County Mr. Ken Griffen, P.E. Director of Engineering City of Coppell PO Box 9478 Coppell, TX 75019 Dear Mr. Griffen: As you are aware, TxDOT will be installing continuous lighting along SH 121 as part of the above subject project. The maintenance and operation lighting responsibilities will be shared by the cities of Grapevine and Coppell. These responsibilities will be divided on a north/south line rather than along the centerline of the roadway. Coppell will be responsible for the northern section of the roadway. A copy of the lighting plans is attached for your reference. TxDOT will supply to the city a drill motor for lowering and raising the light ring at the completion of the project. Please find attached two (2) original Agreements for Construction, Maintenance and Operation of Continuous Highway Lighting Systems within a Municipality for your review and approval. If all is satisfactory, please obtain authorized signatures on both originals and return to me for further processing. A fully executed original will be returned to you for your files and use. If you have any questions, please feel free to contact me at 214-320-6229 or Angela Green at 214-320-4432, if needed. Sincer-ly Melanie B. Yr, ng, 4 . District Tran'.o ion Operations Engineer Attachments THE TEXAS PLAN REDUCE CONGESTION•ENHANCE SAFETY•EXPAND ECONOMIC OPPORTUNITY•IMPROVE AIR QUALITY PRESERVE THE VALUE OF TRANSPORTATION ASSETS An Equal Opportunity Employer