Loading...
Coppell Ind 2-LR130506REEL7 EI-IG I I - IEEFRIMES GEOTECHNICAL AND G R O LJ P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO: Hillwood 3090 Olive Street, Suite 300 Dallas, Texas 75219 ATTN: Mr. Kerry Roetzel CONTRACTOR: Hillwood Construction Services Location of Sarnme REPORT NO. 364 REG PROJECT NO. 18520 SAMPLE DATE: 04 -08 -13 TECHNICIAN: C. Winchester PAGE: 1 of 2 Set Number Cylinder ID Location I Quantity Represented (c. y.) 1 Paving: 278'S, 95'W from NW building corner 30/575 2 Paving: 260'S, 125'W from NW building corner 120/575 3 Paving: 240'S, 110'W from NW building corner 210/575 4 Paving: 225'S, 140'W from NW building corner 310/575 5 Paving: 210'S, 95'W from NW building corner 400/575 6 Paving: 185'S, 125'W from NW building corner 520/575 Design Information Source of Concrete Mix Identification specified strength (psi) Potter 7752 4000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load lbs. Compressive Strength (psi) Average Strength (psi) 1 5842 04 -15 -13 7 149670 5300 5842 05 -06 -13 28 171340 6060 5842 05 -06 -13 28 165990 5870 5970 5842 Hold H 2 5843 04 -15 -13 7 146500 5180 5843 05 -06 -13 28 170180 6020 5843 05 -06 -13 28 179230 6340 6180 5843 Hold H 3 5844 04 -15 -13 7 140760 4980 5844 05 -06 -13 28 172510 6110 5844 05 -06 -13 28 165310 5850 5980 5844 Hold H 4 5845 04 -15 -13 7 136680 4840 5845 05 -06 -13 28 161020 5700 5845 05 -06 -13 28 170400 6030 5870 5845 Hold H 2424 STUTZ DR. • SUITE 400 • DALLAS, TX 75235 • TEL [214] 350 5600 • FAx [214] 350 0019 REPORT NO. 364 REG PROJECT NO. 18520 SAMPLE DATE: 04 -08 -13 PAGE: 2 of 2 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load lbs. Compressive Strength (psi) Average Strength (psi) 5 5846 04 -15 -13 7 145880 5160 65 70 5846 05 -06 -13 28 169920 6010 5.25 6:15 AM 5846 05 -06 -13 28 190100 6730 6370 5844 5846 Hold H 70 3.9 148.0 6 5847 04 -15 -13 7 132380 4680 70 3.9 5847 05 -06 -13 28 166120 5880 8:45 AM 67 5847 05 -06 -13 28 174040 6160 6020 5.0 5847 Hold H 4.0 148.8 33110 Cvlinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. ( °F) Concrete Temp. ( °F) Air Entrainment ( %) Unit Weight (lbs /ft3) Ticket Number 1 5842 4.5 5:30 AM 65 70 4.2 148.8 33061 2 5843 5.25 6:15 AM 65 70 4.1 148.8 33020 3 5844 5.5 6:45 AM 64 70 3.9 148.0 33079 4 5845 5.25 7:35 AM 66 70 3.9 148.8 33089 5 5846 4.25 8:45 AM 67 70 4.0 149.6 33098 6 5847 5.0 9:55 AM 67 72 4.0 148.8 33110 Note: (1) Concrete was sampled in accordance with ASTM C -31 (2) Concrete cylinders were tested in accordance with ASTM C -39 E -Mail Distribution: (1) Hillwood /Mr. Kerry Roetzel (1) Hillwood Construction Services/ Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates /Mr. Lance Clinton (1) Macgregor Associates/ Mr. Thomas Holland (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell /Mr. Lee Stone (1) City of Coppell /Mr. Michael Arellano (1) City of Coppell /Mr. Rick O'Dell (1) Ms. Sacha Miner Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F -3114 Bill Woolwine Sr. Manager, CMT BW /cn