CF-Village-CS 881018Ginn, Inc. Consulting Engineers
October 18, 1988
Russell Doyle, P.E., City Ensineer J '~'""'
City of Coppell
Post Office Box 478
Coppell, Texas 75019 "
Re: Village Parkway Pump Station
Dear Mr. Doyle:
This is to confirm our conversation of October 14, 1988 regarding the
placement of the above referenced project on the November 8, 1988 City Council
agenda. Bids will be received for the Pumps and Motors and the construction
of the pump station on October 27, 1988 at 10:00 A.M.
It is our intention to evaluate the bids and forward our recommendations to
the City on or before Wednesday. November 3rd. If you so desire, we will be
available for a meetino with you. Mr. Ratliff. and.."or Mr. Trando to discuss
the agenda item(s) on either November 3rd or 41h.
Two agenda items will be needed. Tl~e first item will be to consider bids
received for the three (3) pumps and motors and assignment ol' the successful
pump bid to the successful contractor for the Village Parkway Pump Station.
The seoond item will be for the consideration of bids. selection of the
suocessful contractor, and authorization for the Mayor to sign contracts for
the construction of the pump station.
We appreciate your help in expediting this project to the construction phase.
Sincerely.
Sanford W. Case. P.E.
Project Manager
cc: Alan Ratliff
Frank Trando
11. ¥,'ayne Ginn. P.E.
File 380
October 26, i9.,'3S
~-]r. Russell Doyle, F.E., Cizy Fngineer
City of Coppell
P.O. Bcx 478
· =c[:pel] , Texas 75019
Re: Village Pe~rkway P~mp Station (RFP 0O30)
Bid Opening
Dear Mr. Doyle:
!'his is to fc..~-mal ly notify you that we have postponed the bid
iate for the akcve referenced project until Tuesday, November 1,
1988 at 10:00 A.M. in the Co[:pe]] Town Center.
'This -2e[ay is x,:...sessa~i' kased cn Larry ,iackson's ;".c~mo to F'ra
[r-n~.2o date~ Octchor 22, i988 regarding Article 5159 (a) of the
Texas Revised Civil Statutes. The bid '.late has ~'een,_ t~., _,~ ._.t ~- "*' --' ned to
allow for Addendum =4 to be issued which ,..rla~[f'ios the ssue
prevailing wage rates cn this project.
if yrcu have any ,.]t,est].3ns ~-egarding this inditer, please fool
to ~'cntact us.
q i :':ce re iy,
~-ianford W. C:~se, I:'.E.
Poe jest i--::-~:~ager
?~t eve
Dorothy T i ~-n-cns
[3avid Fa~rv
H. Wayne G:r,n, P E.
ADDENDUM NO. 4
PROJECT: VILLAGE PARKWAY PUMP STATION (RFP 0030)
OWNER: City of Coppell, Texas
BID OPENING: 10:00 A.M., Tuesday, November 1, 1988, at
Coppell Town Center, 255 Parkway Blvd., Coppell,
Texas.
ISSUED BY: Ginn, Inc. Consulting Engineers for the City of
Coppell, Texas
THE PROPOSED CONTRACT DRAWINGS AND/OR SPECIFICATIONS FOR THE
ABOVE REFERENCED PROJECT ARE FURTHER MODIFIED AS FOLLOWS:
The bid opening for this project will be delayed until Tuesday,
November 1, 1988 at 10:00 A.M. in the Coppell Town Center, 255
Parkway Blvd., Coppell, Texas.
DRAWING E-5; PLAN VIEW - POWER AND CONTROL
Add the following note:
1. Add two (2) 1 inch spare conduits from center section
of 208 V Motor Control Center to handhole immediately
outside south wall of pump station. Add two (2) 1 inch
spare instrument conduits from instrument panel to same
handhole.
DRAWING E-6; LIGHTING AND MISCELLANEOUS
Add the following note:
1. Add one (1) 3/4 inch underground conduit with 3-#12,
#12 ground from the nearest outside receptacle to each
heat trace thermostat included in Addendum #1.
DRAWING OP-1,2,3,4,5: OFFSITE WATERLINES
Add the following note to each sheet:
1. Ail steel encasement for waterlines shall API 5L, Grade
B line pipe (mill reject pipe is acceptable), minimum
0.250" wall thickness, of the nominal diameter
indicated on the plans. The exterior and interior of
all steel encasement pipe shall be coated with a
minimum of 1.0 mils of bituminous coating.
GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION
DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS
ADDENDUM NO. 4
PAGE 2
SECTION 00470 - BREAKDOWN OF ESTIMATED COSTS
This section will not be required for submission with the Bids
for this Project. Ail Contractors submitting proposals on this
project will be required to submit this section to the office of
the Engineer within 24 hours of bid opening. Ail totals by
Division must agree with the Summary Breakdown of Estimated Costs
which is to be submitted with each Proposal.
SECTION 00470-A - SUMMARY BREAKDOWN OF ESTIMATED COSTS
This section is being issued and must be submitted with the
executed proposal forms. The Total must agree with the amount
listed in the proposal form for this project.
SECTION 00830 - SPECIFIC PROJECT REOUIREMENTS
Add the following PARAGRAPH 1.19, WAGE RATES:
1.19 WAGE RATES
Ail employees directly employed on this project by the
Contractor or his sub-contractors shall be paid the
Prevailing Wage Scale for work of a similar character in the
locality, and in no event less than the minimum rates per
hour specified in Appendix B. The wage rates applicable to
the work called for are the minimum to be paid to the
various classes of labor and crafts. The Contractor is at
liberty to pay any amount over and above the rates called
for herein.
The rates contained in Appendix B have not been formally
adopted by the City of Coppell. It is anticipated that
these rates will be adopted prior to the award of this
contract. Should the adopted rates vary from the rates
contained in Appendix B, appropriate compensation will be
negotiated with the Successful Contractor.
APPENDIX B: AGC OF TEXAS, HIGHWAY, HEAVY, UTILITIES & INDUSTRIAL
BRANCH,' SEPTEMBER 1988 WAGE RATE SCHEDULE; IS HEREBY ISSUED.
SECTION 11100 - HORIZONTAL SPLIT CASE CENTRIFUGAL PUMPS
PARAGRAPH 2.4, INDUCTION MOTORS; Subparagraph A, General: Add the
following:
6. The provisions of SECTION 01360, GENERAL EQUIPMENT
STIPULATIONS, PARAGRAPH 2.01, (F) shall not apply
to these motors.
GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION
DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS
ADDENDUM NO. 4
PAGE 3
SECTION 16000 - GENERAL PROVISIONS
PARAGRAPH 1.02, PERMITS, CODES AND UTILITIES;
Subparagraph D (2), Replace with the following:
2. Furnish and install two transformer pads and two
metering pads based on utility information.
Subparagraph D (3), Add the following:
3. Cost of overhead primary and costs for the second
service transformer will be paid by the OWNER (Not In
This Contract).
SECTION 16360 - MEDIUM VOLTAGE CONTROL CENTERS
PARAGRAPH 2.01, MEDIUM VOLTAGE CONTROL CENTER, Subparagraph P
(2): Delete the word "drawout" from the sentence.
ISSUED THIS 26th DAY OF OCTOBER, 1988.
GINN, INC. CONSULTING ENGINEERS
Sanford W. Case, P.E.
Project Manager
** BIDDER'S ARE REMINDED OF THE FOLLOWING:
1. Receipt of this Addendum must be acknowledged on the
executed Proposal and Bid Forms.
2. All Proposals must be submitted in duplicate (same
envelope is acceptable).
GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION
DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS
AP. .DIX B - VILLAGE PARKI~AY PL~iP ~_aTION
AGC O~
HIGHWAY0 HEAV~f, UTILITIES & XNDUSTRIAL BRAmCH
flBPTBI(BBR 1988
WAGE RATES PAID FOR HIGH#AY-IIEAV¥ COBSTRUCTZON AiID PAV~HG AJID UTILITIES
ZNCIDEHTAL TO GEBERAL BUILDImG CO~STRUCTIO#, ZONE 36, WHICH IBCLUDES,
D A I,l, A $ C O U N T Y T E × A $
ClasolElcs~lon Hourly Rate Classification Hourly Ra~e
Air Tool Operator ?.50 ~OWE~ KOUIPHEBT OFIP-ATO~5, ~OIT.
Asphalt lieater Operato~ 8.0~
Asphalt Raker 9.00 ~oller, Steel Wheel (Other 8.05
Asphalt Shoveler 8.25 Flat Wheel or Tamping]
Batchin~ Plant Scale Operator 8.$0 ~ol]er, Pneumatic (Self 7.10
Batterboard Setter 8.45 Propelled}
Carpenter, Rough 9.10 Scrapers {l? CY & Less) 7.90
Carpenter Helper, Rough 7.10 Scrapers {Over 17 CY] 8.30
Concrete Finisher (Pay) 9.20 Sel~-Propelled Hammer 6.00
Concrete Finisher HIpr. (Pay) 7.40 Side Boom ~.O0
Concrete Finisher (Strs~ 8.90 Tractor (Crawler} 150HP & 8.00
Concrete Finisher H1pr. (SEra) ~.90 Less
Concrete ~ubber 7.00 Tractor (Crawler] Over I~OHP 8.90
Electrician 12.25 Tractor (Pneumatic} 80HP &
Electrician Ilelper (Sr.) 10.20 Less
Electrician Helper (Jr.) 8°75 Tractor (Pneumatic) Over 7.40
Form Builder (SEra) 8.20 80 HP
Form Builder Helper (SEra) ~.90 Traveling Mixer
Form Liner (Pay & Curb) 8.~O Trenching Machine, Light 7.80
Form Setter (Pay & Curb} 6.~5 Trenching Machine, Heavy 8.00
Form Setter Hlpf. (Pay & Curb) 7.50 Reln~orcing Steel Setter 7.00
Form Setter (Str~) 8.10 (Paving)
Form Setter Helper (SEra) 6.80 Reinforcing Steel Setter
Laborer, Common ~.10 (SEra)
Laborer, Utility ?.O~ Reinforcing Steel Setter 7.20
Mechanic 10.OO Helper
Mechanic Helper 8.90 Sign Erector 8.30
Oiler 8.50 Sign Erector Helper 7.10
Servicer 7.55 Spreader Box Operator 7.30
Painter (SEra) 10.OO
Plpelayer 7.45 ?R~
PJpelayer Helper 6.50
Pneumatic Hortar Operator 6.80 Single Axle, Light 7.15
Single Axle, Heavy 7.40
POWER EQUIPmenT OPERATORS, Tandem Axle or Semitrailer 7.15
Lowboy-Float 7.90
Asphalt Distributor 7.85 Transit Hlx 7.20
Asphalt Paving Machine 8.95 Winch 7.00
Broom or Sweeper ODer 8.75
Bulldozer, 150 HP & le~s 8.05 Welder 9.85
Bulldozer, Over 150 HP 9.05 Flagger 5.75
Concrete Pay. Curin~ Machine 8.40 Hilling Machine Operator 8.05
Concrete Pav. Finishing Mach. 9.05
Concrete Pay. Form Grader
Concrete Pay. Joint Machine 8.00
Cohcrete Paving Saw 8.30
C'oncrete Paving Spreader 8.60
Crane, Clamshell, Dackhoe, 9.10
Derrick, Draqline, Shovel
(less than 1 1/2 CY)
Crane, Clamshell, Backhoe, 9.80
Derrick, Prsqllne, Shovel
(1 1/2 C¥ & over}
Crusher.or Scrn'g Plant Oper. 6.00
Fora Loader 6.40
Foundation Drill Operator 10.O5
(Truck Mounted)
Front End Loader 8.30
(2 1/2 CY & leas)
Front End Loader 8.95
(Over 2 1/2 CY)
Hlxer (16 C~ & Less) 6.60
Mo~o~ Grade 0pe~ar0r~ Fine ~.75
Hotor Grade Operator 9.00
Roller, Steel Wheel (Plant- 8.10
Hix Pavements)
DIVISION 0 - BIDDaRG AND CONTRACT REOUIREMENTS PAGE
SECTION 00470 A - SUMMARY BREAKDOWN OF ESTIMATED COSTS 00470 A-1
PART i - GENERAL (TO BE SUBMITTED WITH BID PROPOSAL)
1.1 CONTRACTOR'S SUMMARY OF COST BREAKDOWN FOR THE VILLAGE
PARKWAY PUMP STATION:
A. Concurrently with the submittal of bids for all the
work under this contract, each bidder(s) shall
furnish to the Engineer, in writing, a summary
breakdown of costs for the bid item, "Village Parkway
Pump Station Complete,' indicating the amounts included
in his bid for the various features of the work
included as listed below. The sum of the individual
amounts shall equal the total amount bid:
DIVISION 0 - CONTRACT REQUIREMENTS $
DIVISION 1 - GENERAL REQUIREMENTS $
DIVISION 2 - SITEWORK $
DIVISION 3 - CONCRETE $
DIVISION 4 - MASONRY $
DIVISION 5 - METALS $
DIVISION 6 - WOOD AND PLASTICS $
DIVISION 7 - THERMAL AND MOISTURE PROTECTION $
DIVISION 8 - DOORS AND WINDOWS $
DIVISION 9 - FINISHES $
DIVISION 10 - SPECIALTIES $
DIVISION 11 - EQUIPMENT $
DIVISION 12 - FURNISHING $
DIVISIO1~ 13 - INSTRUMENTATION $
DIVISION 15 - MECHANICAL $
DIVISION 16 - ELECTRICAL $
PROJECT TOTAL * $
· Must Equal Total Amount On Proposal Form
END OF SECTION
GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION