CF-Village-CS 881018Ginn, Inc. Consulting Engineers October 18, 1988 Russell Doyle, P.E., City Ensineer J '~'""' City of Coppell Post Office Box 478 Coppell, Texas 75019 " Re: Village Parkway Pump Station Dear Mr. Doyle: This is to confirm our conversation of October 14, 1988 regarding the placement of the above referenced project on the November 8, 1988 City Council agenda. Bids will be received for the Pumps and Motors and the construction of the pump station on October 27, 1988 at 10:00 A.M. It is our intention to evaluate the bids and forward our recommendations to the City on or before Wednesday. November 3rd. If you so desire, we will be available for a meetino with you. Mr. Ratliff. and.."or Mr. Trando to discuss the agenda item(s) on either November 3rd or 41h. Two agenda items will be needed. Tl~e first item will be to consider bids received for the three (3) pumps and motors and assignment ol' the successful pump bid to the successful contractor for the Village Parkway Pump Station. The seoond item will be for the consideration of bids. selection of the suocessful contractor, and authorization for the Mayor to sign contracts for the construction of the pump station. We appreciate your help in expediting this project to the construction phase. Sincerely. Sanford W. Case. P.E. Project Manager cc: Alan Ratliff Frank Trando 11. ¥,'ayne Ginn. P.E. File 380 October 26, i9.,'3S ~-]r. Russell Doyle, F.E., Cizy Fngineer City of Coppell P.O. Bcx 478 · =c[:pel] , Texas 75019 Re: Village Pe~rkway P~mp Station (RFP 0O30) Bid Opening Dear Mr. Doyle: !'his is to fc..~-mal ly notify you that we have postponed the bid iate for the akcve referenced project until Tuesday, November 1, 1988 at 10:00 A.M. in the Co[:pe]] Town Center. 'This -2e[ay is x,:...sessa~i' kased cn Larry ,iackson's ;".c~mo to F'ra [r-n~.2o date~ Octchor 22, i988 regarding Article 5159 (a) of the Texas Revised Civil Statutes. The bid '.late has ~'een,_ t~., _,~ ._.t ~- "*' --' ned to allow for Addendum =4 to be issued which ,..rla~[f'ios the ssue prevailing wage rates cn this project. if yrcu have any ,.]t,est].3ns ~-egarding this inditer, please fool to ~'cntact us. q i :':ce re iy, ~-ianford W. C:~se, I:'.E. Poe jest i--::-~:~ager ?~t eve Dorothy T i ~-n-cns [3avid Fa~rv H. Wayne G:r,n, P E. ADDENDUM NO. 4 PROJECT: VILLAGE PARKWAY PUMP STATION (RFP 0030) OWNER: City of Coppell, Texas BID OPENING: 10:00 A.M., Tuesday, November 1, 1988, at Coppell Town Center, 255 Parkway Blvd., Coppell, Texas. ISSUED BY: Ginn, Inc. Consulting Engineers for the City of Coppell, Texas THE PROPOSED CONTRACT DRAWINGS AND/OR SPECIFICATIONS FOR THE ABOVE REFERENCED PROJECT ARE FURTHER MODIFIED AS FOLLOWS: The bid opening for this project will be delayed until Tuesday, November 1, 1988 at 10:00 A.M. in the Coppell Town Center, 255 Parkway Blvd., Coppell, Texas. DRAWING E-5; PLAN VIEW - POWER AND CONTROL Add the following note: 1. Add two (2) 1 inch spare conduits from center section of 208 V Motor Control Center to handhole immediately outside south wall of pump station. Add two (2) 1 inch spare instrument conduits from instrument panel to same handhole. DRAWING E-6; LIGHTING AND MISCELLANEOUS Add the following note: 1. Add one (1) 3/4 inch underground conduit with 3-#12, #12 ground from the nearest outside receptacle to each heat trace thermostat included in Addendum #1. DRAWING OP-1,2,3,4,5: OFFSITE WATERLINES Add the following note to each sheet: 1. Ail steel encasement for waterlines shall API 5L, Grade B line pipe (mill reject pipe is acceptable), minimum 0.250" wall thickness, of the nominal diameter indicated on the plans. The exterior and interior of all steel encasement pipe shall be coated with a minimum of 1.0 mils of bituminous coating. GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS ADDENDUM NO. 4 PAGE 2 SECTION 00470 - BREAKDOWN OF ESTIMATED COSTS This section will not be required for submission with the Bids for this Project. Ail Contractors submitting proposals on this project will be required to submit this section to the office of the Engineer within 24 hours of bid opening. Ail totals by Division must agree with the Summary Breakdown of Estimated Costs which is to be submitted with each Proposal. SECTION 00470-A - SUMMARY BREAKDOWN OF ESTIMATED COSTS This section is being issued and must be submitted with the executed proposal forms. The Total must agree with the amount listed in the proposal form for this project. SECTION 00830 - SPECIFIC PROJECT REOUIREMENTS Add the following PARAGRAPH 1.19, WAGE RATES: 1.19 WAGE RATES Ail employees directly employed on this project by the Contractor or his sub-contractors shall be paid the Prevailing Wage Scale for work of a similar character in the locality, and in no event less than the minimum rates per hour specified in Appendix B. The wage rates applicable to the work called for are the minimum to be paid to the various classes of labor and crafts. The Contractor is at liberty to pay any amount over and above the rates called for herein. The rates contained in Appendix B have not been formally adopted by the City of Coppell. It is anticipated that these rates will be adopted prior to the award of this contract. Should the adopted rates vary from the rates contained in Appendix B, appropriate compensation will be negotiated with the Successful Contractor. APPENDIX B: AGC OF TEXAS, HIGHWAY, HEAVY, UTILITIES & INDUSTRIAL BRANCH,' SEPTEMBER 1988 WAGE RATE SCHEDULE; IS HEREBY ISSUED. SECTION 11100 - HORIZONTAL SPLIT CASE CENTRIFUGAL PUMPS PARAGRAPH 2.4, INDUCTION MOTORS; Subparagraph A, General: Add the following: 6. The provisions of SECTION 01360, GENERAL EQUIPMENT STIPULATIONS, PARAGRAPH 2.01, (F) shall not apply to these motors. GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS ADDENDUM NO. 4 PAGE 3 SECTION 16000 - GENERAL PROVISIONS PARAGRAPH 1.02, PERMITS, CODES AND UTILITIES; Subparagraph D (2), Replace with the following: 2. Furnish and install two transformer pads and two metering pads based on utility information. Subparagraph D (3), Add the following: 3. Cost of overhead primary and costs for the second service transformer will be paid by the OWNER (Not In This Contract). SECTION 16360 - MEDIUM VOLTAGE CONTROL CENTERS PARAGRAPH 2.01, MEDIUM VOLTAGE CONTROL CENTER, Subparagraph P (2): Delete the word "drawout" from the sentence. ISSUED THIS 26th DAY OF OCTOBER, 1988. GINN, INC. CONSULTING ENGINEERS Sanford W. Case, P.E. Project Manager ** BIDDER'S ARE REMINDED OF THE FOLLOWING: 1. Receipt of this Addendum must be acknowledged on the executed Proposal and Bid Forms. 2. All Proposals must be submitted in duplicate (same envelope is acceptable). GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS AP. .DIX B - VILLAGE PARKI~AY PL~iP ~_aTION AGC O~ HIGHWAY0 HEAV~f, UTILITIES & XNDUSTRIAL BRAmCH flBPTBI(BBR 1988 WAGE RATES PAID FOR HIGH#AY-IIEAV¥ COBSTRUCTZON AiID PAV~HG AJID UTILITIES ZNCIDEHTAL TO GEBERAL BUILDImG CO~STRUCTIO#, ZONE 36, WHICH IBCLUDES, D A I,l, A $ C O U N T Y T E × A $ ClasolElcs~lon Hourly Rate Classification Hourly Ra~e Air Tool Operator ?.50 ~OWE~ KOUIPHEBT OFIP-ATO~5, ~OIT. Asphalt lieater Operato~ 8.0~ Asphalt Raker 9.00 ~oller, Steel Wheel (Other 8.05 Asphalt Shoveler 8.25 Flat Wheel or Tamping] Batchin~ Plant Scale Operator 8.$0 ~ol]er, Pneumatic (Self 7.10 Batterboard Setter 8.45 Propelled} Carpenter, Rough 9.10 Scrapers {l? CY & Less) 7.90 Carpenter Helper, Rough 7.10 Scrapers {Over 17 CY] 8.30 Concrete Finisher (Pay) 9.20 Sel~-Propelled Hammer 6.00 Concrete Finisher HIpr. (Pay) 7.40 Side Boom ~.O0 Concrete Finisher (Strs~ 8.90 Tractor (Crawler} 150HP & 8.00 Concrete Finisher H1pr. (SEra) ~.90 Less Concrete ~ubber 7.00 Tractor (Crawler] Over I~OHP 8.90 Electrician 12.25 Tractor (Pneumatic} 80HP & Electrician Ilelper (Sr.) 10.20 Less Electrician Helper (Jr.) 8°75 Tractor (Pneumatic) Over 7.40 Form Builder (SEra) 8.20 80 HP Form Builder Helper (SEra) ~.90 Traveling Mixer Form Liner (Pay & Curb) 8.~O Trenching Machine, Light 7.80 Form Setter (Pay & Curb} 6.~5 Trenching Machine, Heavy 8.00 Form Setter Hlpf. (Pay & Curb) 7.50 Reln~orcing Steel Setter 7.00 Form Setter (Str~) 8.10 (Paving) Form Setter Helper (SEra) 6.80 Reinforcing Steel Setter Laborer, Common ~.10 (SEra) Laborer, Utility ?.O~ Reinforcing Steel Setter 7.20 Mechanic 10.OO Helper Mechanic Helper 8.90 Sign Erector 8.30 Oiler 8.50 Sign Erector Helper 7.10 Servicer 7.55 Spreader Box Operator 7.30 Painter (SEra) 10.OO Plpelayer 7.45 ?R~ PJpelayer Helper 6.50 Pneumatic Hortar Operator 6.80 Single Axle, Light 7.15 Single Axle, Heavy 7.40 POWER EQUIPmenT OPERATORS, Tandem Axle or Semitrailer 7.15 Lowboy-Float 7.90 Asphalt Distributor 7.85 Transit Hlx 7.20 Asphalt Paving Machine 8.95 Winch 7.00 Broom or Sweeper ODer 8.75 Bulldozer, 150 HP & le~s 8.05 Welder 9.85 Bulldozer, Over 150 HP 9.05 Flagger 5.75 Concrete Pay. Curin~ Machine 8.40 Hilling Machine Operator 8.05 Concrete Pav. Finishing Mach. 9.05 Concrete Pay. Form Grader Concrete Pay. Joint Machine 8.00 Cohcrete Paving Saw 8.30 C'oncrete Paving Spreader 8.60 Crane, Clamshell, Dackhoe, 9.10 Derrick, Draqline, Shovel (less than 1 1/2 CY) Crane, Clamshell, Backhoe, 9.80 Derrick, Prsqllne, Shovel (1 1/2 C¥ & over} Crusher.or Scrn'g Plant Oper. 6.00 Fora Loader 6.40 Foundation Drill Operator 10.O5 (Truck Mounted) Front End Loader 8.30 (2 1/2 CY & leas) Front End Loader 8.95 (Over 2 1/2 CY) Hlxer (16 C~ & Less) 6.60 Mo~o~ Grade 0pe~ar0r~ Fine ~.75 Hotor Grade Operator 9.00 Roller, Steel Wheel (Plant- 8.10 Hix Pavements) DIVISION 0 - BIDDaRG AND CONTRACT REOUIREMENTS PAGE SECTION 00470 A - SUMMARY BREAKDOWN OF ESTIMATED COSTS 00470 A-1 PART i - GENERAL (TO BE SUBMITTED WITH BID PROPOSAL) 1.1 CONTRACTOR'S SUMMARY OF COST BREAKDOWN FOR THE VILLAGE PARKWAY PUMP STATION: A. Concurrently with the submittal of bids for all the work under this contract, each bidder(s) shall furnish to the Engineer, in writing, a summary breakdown of costs for the bid item, "Village Parkway Pump Station Complete,' indicating the amounts included in his bid for the various features of the work included as listed below. The sum of the individual amounts shall equal the total amount bid: DIVISION 0 - CONTRACT REQUIREMENTS $ DIVISION 1 - GENERAL REQUIREMENTS $ DIVISION 2 - SITEWORK $ DIVISION 3 - CONCRETE $ DIVISION 4 - MASONRY $ DIVISION 5 - METALS $ DIVISION 6 - WOOD AND PLASTICS $ DIVISION 7 - THERMAL AND MOISTURE PROTECTION $ DIVISION 8 - DOORS AND WINDOWS $ DIVISION 9 - FINISHES $ DIVISION 10 - SPECIALTIES $ DIVISION 11 - EQUIPMENT $ DIVISION 12 - FURNISHING $ DIVISIO1~ 13 - INSTRUMENTATION $ DIVISION 15 - MECHANICAL $ DIVISION 16 - ELECTRICAL $ PROJECT TOTAL * $ · Must Equal Total Amount On Proposal Form END OF SECTION GINN, INC. CONSULTING ENGINEERS VILLAGE PARKWAY PUMP STATION DALLAS, TEXAS PROJECT NO. 380 CITY OF COPPELL, TEXAS