Loading...
Gateway BP(2.5) Naterra DEVELOPMENT FEES PROJECT NAME: Gateway Business Park Phase 2, Lot 1 Block B ENGINEER:Pacheco Koch ORIGINATION DATE:5/8/2013 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$21,438.00 Wastewater Impact Fee$14,391.00 Park Fee$0.00 Roadway Impact-Zone$38,065.44$38,065.44ra8/19/2013 Street Sign Street Light Construction Inspection$22,934.33$22,934.33ra8/19/2013 EG or Bore Permit 11/11/2013Overtime Inspection$432.00$432.001/6/2014 Water Tap Inspection$300.00 Wastewater Tap Inspection$150.00 Water Meter (Domestic)$2,646.00 Water Meter (Fire/Irrig)$882.00 Meter Deposit (Domestic)$90.00 Meter Deposit (Fire/Irrig)$90.00 Utility Final Inspection$150.00 Subtotal to Eng.$61,431.77$61,431.77$0.00 Total FeesFees PaidAmount Owed TOTALS $101,568.77$61,431.77$40,137.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. T H E C I T Y O F COPPELL A 8 1 $ November 11, 2013 Jeremy Routsong CalHar Construction,Inc. 2138 Ca1Har Drive Melissa TX 75454 RE: Gateway Business Park,Phase 2,Lot 1 Block B (Naterra) Overtime Inspection Dear Mr. Routsong: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, November 9, 2013. The overtime rate including salary and benefits is $54.00 per hour. Eight hours (8 hrs.) were charged to your company on that date. Please send a copy of this letter along with your check for $432.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call(972) 304-3679. Sincerely, L. IV D.vis Con • ction Ins sector Office Phone: (972)304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 [CaiHar Construction, Inc. November 6,2013 City of Coppell Engineering Dept. Attn: Larry Davis 255 Parkway Blvd. Coppell, TX 75019-4409 Office:972-304-3684 Fax: 972-304-3570 RE: Naterra Corp / Ca1Har Job#212404 1250 S Freeport Parkway Coppell,Texas Mr. Davis: We are requesting Saturday inspection for November 9,2013. Our Foreman on-site will be Dennis Daniels. His mobile phone number is 214-325-1876. Please forward invoices for over-time inspection fees to our office as needed. Any questions or comments,please contact me at 972-816-8964. Sincerely, Jeremy Routsong Project Manager 2138 CalHar Drive* Melissa,Texas 75454 * Office 972-838-2888 *Fax 972-838-2299 TO d elVH1d0 66ZZ8E8ZL6 bZ:ET ETOZ/LO/TT • SFPLP HOLDINGS MANAGEMENT LLC 1031 13525 DENTON DR, + FARMERS BRANCH,TX 75234 ' p 30-9/1140 DATE 6 f/e/ eD13 9a ORD R OF ` , d (. 9 i $ Fia al; . i. _ i _ /.S. - . _r . _-. ' yid& A 1 DOLLARS n I. - art= F + rost '�"` www.frostbankcom I, + FOR :.a� W -4. id ac_ 1 I I _7:& ---- -(- --_—�_ r CASH 1 RECEIPT Date 9fif f/3 096710 -o Received From SF9PL.P / L L C 0. +^°n Address . A.Cx P /'/& e! pC / E�"Ceat L� ° ° 2 ° `/CGiG 41Je r w m F Dollars$3 J 49J I o —N For iL 1sC 4itd lee- z'a a8 Vnv c,1 ACCOUNT HOW PAID AMT.OF ACCOUNT CASH 2 U AML PAID SI O A CHECK BALANCE U - MONEY ORDER❑ B�I CREW CARS❑ 1 3 096711 RECET Date 8 . If 6 Received From 9,-�4-� 1---/-d � , °n� c Address d � 4O c2 o ' 1Ld , S Dollars 7,J3 e r s .N For ‘- �� lir G ' ` a%d z'a V / c��t ACCOUNT HOW PAID AMT OF CASH ACCO NT A AID; ---plzieipr__. 2 9:51f32 I 32 CHECK ' `...0 So. BALANCE J MONEY ORDER❑ By ` .DUE. CREDIT GARDE] - d SFPLP HOLDINGS MANAGEMENT LLC 1 030 13525 DENTON DR, FARMERS BRANCH,TX 75234 + 30-9/1140 //#/zo/3 98 DATE b PAY TO THE e ORDER OF L C 111 41,P.e. I $ 22.9? 1 •I el- / 33 r __ -. ea' •G _ if AK_...„a_._ .. !...a: /610 DOLLARS n '_ Frost + "` www.frostbank.com FOR /itSpc r 14A-.44.-T--4,2, 184k13 -7E__Ti.! - 1 1� _L /1 m. ....... ._.......... ....__ ............_ --..... _. .. .... _....... ........_._ T H E • C I T Y • O F COPPELL o May 8, 2013 Clayton Strolle, P.E. Pacheco Koch Consulting Engineers 8350 N. Central Expressway, Suite 1000 Dallas, TX 75206 RE: Gateway Bus. Park 2 Lot 1 Blk B Fee Assessment Letter Dear Mr. Strolle, Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of$38,065.44 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions,please contact me. Sincerely, Michael Garza, P.E. Civil Engineer cc: Jennifer Miller, Finance Director Glenn Hollowell,Assistant Director of Public Works Tim Oates, Deputy Chief/Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV DEVELOPMENT FEE TABLE Project: Gateway Bus. Park 2 Lot 1 Blk B Date: 4/22/2013 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $21,438.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $300.00 (100%due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,646.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $882.00 (100% due at Issuance of Water Meter) Water Meter Deposit(Domestic) $90.00 (100%due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $14,391.00 (100%due at Issuance of Building Permit) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $38,065.44 $38,065.44 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100%due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II TOTAL $78,202.44 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $38,065.44 DEVELOPMENT FEE WORKSHEET PROJECT: Gateway Bus. Park 2 Lot 1 Blk B DATE: 4/22/2013 Water Impact Fee: Domestic Meter(s): 3 -2 inch = 15.99 ESU's Irrigation Meter(s): 1 -2 inch = 5.33 ESU's 0 = 0 ESU's Fireline Meter(s): 2 -8 inch = 2.5 ESU's Total#: 23.82 ESU's @ $900.00 ea. $21,438.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total#: 6 Connections @$50.00 ea. $300.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 3 Domestic Meter(s) @ $882.00 $2,646.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total#: 1 Irrigation Meter(s) @ $882.00 $882.00 Total#: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total#: 2 Fireline Meter(s) @ n/a meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total#: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 15.99 @$900.00 ea. $14,391.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 3 Connections @ $50.00 ea. $150.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total#: 3 Lots @ $50.00 ea. $150.00 (100% due prior to issuance of building permit) Park Fee(For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $38,065.44 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Gateway Bus.Park 2 Lot 1 Blk B DATE: 4/22/2013 ROADWAY IMPACT FEE: Service Area * 1 Category** Light Industrial Land Use ** General Light Industrial Building Area(sf) 317,212 Development Units** 317.21 Vehicle Miles per Development Unit** 3.2 Fee per Vehicle Mile*** $150 Roadway Impact Fee due=(Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $152,261.76 * (Figure 4.1 -Roadway Impact Fee Study) **(Table 4.10-Roadway Impact Fee Study) ***(Schedule 2,Page 3 -The Master Fee Schedule) Percent of Credit Toward Roadway Impact Fees 75% Total Credit $114,196.32 000441