Loading...
Coppell Ind 2-LR130503 CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORT NO. REPORTED TO: 392 Hillwood 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 04-26-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: C. Winchester PAGE: 1 of 2 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 645’N, 15’W from SW building corner 20/500 2 Paving: 675’N, 75’W from SW building corner 110/500 3 Paving: 710’N, 70’W from SW building corner 220/500 4 Paving: 770’N, 80’W from SW building corner 310/500 5 Paving: 785’N, 75’W from SW building corner 420/500 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter 7752 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 6281 05-03-13 7 134120 4750 6281 05-24-13 28 6281 05-24-13 28 6281 Hold H 2 6282 05-03-13 7 135930 4810 6282 05-24-13 28 6282 05-24-13 28 6282 Hold H 3 6283 05-03-13 7 146110 5170 6283 05-24-13 28 6283 05-24-13 28 6283 Hold H 4 6284 05-03-13 7 145070 5130 6284 05-24-13 28 6284 05-24-13 28 6284 Hold H 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT NO. 392 REG PROJECT NO. 18520 SAMPLE DATE: 04-26-13 PAGE: 2 of 2 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 5 6285 05-03-13 7 122870 4350 6285 05-24-13 28 6285 05-24-13 28 6285 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 6281 5.5 4:25 AM 62 70 3.7 147.2 33396 2 6282 5.0 5:10 AM 62 70 3.6 148.0 33405 3 6283 4.75 6:15 AM 62 69 3.5 148.0 33416 4 6284 5.0 7:25 AM 62 69 3.7 148.0 33425 5 6285 5.0 8:40 AM 62 69 3.6 148.0 33436 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner