Westhaven-LR130506 ALPHA /j\ TESTING REPORT OF FIELD
2209 Wisconsin Street, Suite 100 COMPACTION TESTS
Dallas, Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No.813
TESTED FOR: Standard Pacific Homes- Irving DATE: 05/06/13
Irving, Texas
PROJECT: Westhaven Phase 1 &2-Mass Grading OUR REPORT NO.: 130127-94
'`"41117
Coppell, Texas
TEST DATA: TECHNICIAN: Don Hinton
TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT*
NO. DEPTH NUMBER PCF PCF COMPACTION
2020 05/06/13 FG-7.0 5 14.4 111.9 18.0 110 98 1-A
2021 05/06/13 FG-6.0 5 14.4 111.9 17.1 109 98 1-A
2022 05/06/13 FG-5.0 5 14.4 111.9 18.4 109 97 1-A
2023 05/06/13 FG-4.0 5 14.4 111.9 18.1 107 96 1-A
2024 05/06/13 FG-3.0 5 14.4 111.9 17.2 111 99 1-A
2025 05/06/13 FG-2.0 5 14.4 111.9 17.3 112 100 1-A
2026 05/06/13 FG-1.0 5 14.4 111.9 18.3 110 98 1-A
TEST LOCATION:
2020 Sanitary Sewer Line at Station 20+00
2021 Sanitary Sewer Line at Station 20+05
2022 Sanitary Sewer Line at Station 20+08
2023 Sanitary Sewer Line at Station 20+10
2024 Sanitary Sewer Line at Station 20+12
2025 Sanitary Sewer Line at Station 20+15 ;,/
2026 Sanitary Sewer Line at Station 20+18 ,,' `.
1. FILL *A. IN PLACE PERCENT MOISTURE AND PERCENT ...MP R` COMPLY WITH SPECIFICATIO S
2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY W - IFICATIONS
3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICA ONS Z D spectfully Submitted,
4. CEMENT TREATED D. RETEST UJ j j _ „
fi, f Abushakra,P.E.
ALPHA TESTING,INC.
Our test results and reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distributed except vdth express approval of ALPHA.The
use of our name and test results must receive our written approval.Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar
specimens.
ALPHA / TESTING REPORT OF FIELD
2209 Wisconsin Street,Suite 100
COMPACTION TESTS
Dallas,Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No.813
TESTED FOR: Standard Pacific Homes- Irving DATE: 05/06/13
Irving, Texas
PROJECT: Westhaven Phase 1 &2-Mass Grading OUR REPORT NO.: 130127-94A
Coppell,Texas
TEST DATA: TECHNICIAN: Don Hinton
TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT*
NO. DEPTH NUMBER % PCF % PCF COMPACTION
2027 05/06/13 FG-7.0 1 11.9 117.9 14.5 116 98 1-A
2028 05/06/13 FG-6.0 1 11.9 117.9 13.2 114 97 1-A
2029 05/06/13 FG-5.0 1 11.9 117.9 13.3 114 96 1-A
2030 05/06/13 FG-4.0 1 11.9 117.9 15.2 116 98 1-A
2031 05/06/13 FG-3.0 1 11.9 117.9 12.5 116 99 1-A
2032 05/06/13 FG-2.0 1 11.9 117.9 11.9 118 100 1-A
2033 05/06/13 FG-1.0 1 11.9 117.9 12.2 116 98 1-A
TEST LOCATION:
2027 Sanitary Sewer Manhole at Station 17+41 -North
2028 Sanitary Sewer Manhole at Station 17+41 - East
2029 Sanitary Sewer Manhole at Station 17+41 -West
2030 Sanitary Sewer Manhole at Station 17+41 -South
2031 Sanitary Sewer Manhole at Station 17+41 - North
2032 Sanitary Sewer Manhole at Station 17+41 - East
2033 Sanitary Sewer Manhole at Station 17+41 -West
1. FILL *A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted,
4. CEMENT TREATED D. RETEST
Attef Abushakra,P.E.
ALPHA TESTING,INC.
Our test results and reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA.The
use of our name and test results must receive our written approval.Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar
specimens.
ALPHA /•\ T E S T I N G REPORT OF FIELD
2209 Wisconsin Street, Suite 100 COMPACTION TESTS
Dallas,Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No.813
TESTED FOR: Standard Pacific Homes- Irving DATE: 05/06/13
Irving, Texas
PROJECT: Westhaven Phase 1 &2-Mass Grading OUR REPORT NO.: 130127-94B
Coppell, Texas
TEST DATA: TECHNICIAN: Don Hinton
TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE
DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY PERCENT COMMENT`
NO. DEPTH NUMBER % PCF % PCF COMPACTION
2034 05/06/13 FG-7.0 1 11.9 117.9 13.2 115 8 1-A
2035 05/06/13 FG-6.0 1 11.9 117.9 11.9 116 99 1-A
2036 05/06/13 FG-5.0 1 11.9 117.9 15.5 113 96 1-A
2037 05/06/13 FG-4.0 1 11.9 117.9 15.0 113 96 1-A
2038 05/06/13 FG-3.0 5 14.4 111.9 17.3 112 100 1-A
2039 05/06/13 FG-2.0 5 14.4 111.9 17.5 109 97 1-A
2040 05/06/13 FG-1.0 5 14.4 111.9 18.0 108 7 1-A
TEST LOCATION:
2034 Sanitary Sewer Line A at Station 22+00
2035 Sanitary Sewer Line A at Station 22+05
2036 Sanitary Sewer Line A at Station 22+08
2037 Sanitary Sewer Line A at Station 22+10
2038 Sanitary Sewer Line A at Station 22+12
2039 Sanitary Sewer Line A at Station 22+15
2040 Sanitary Sewer Line A at Station 22+21
1. FILL 'A. IN PLACE PERCENT • :.AND PERCENT COMPACTION COMPLY TIViATI NS
2. NATURAL SUBGRADE B. PERCENT COMPAC • ••:.i OT COMPLY WITH SPECIFICATI NS
3. LIME STABILIZED C. PERCENT IN PLAC:, e: ':DOES NOT COMPLY WITH SPECI IC Respectfully Submitted,
4. CEMENT TREATED D. RETEST l
/` Q V` .= ,I
/ Attef Abushakra,P.E.
I ALPHA TESTING,INC.
Our test results and reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA.The
use of our name and test results must receive our written approval.Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar
specimens.