E x A s 1 5
May 23,2013
John Papagolos
Papagolos Development Company
5225 Village Creek
Suite 300
Plano TX 75093
RE: Carter Addition, Phase III
Final Acceptance
Dear Mr. Papagolos:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two-year maintenance bonds and record drawings
have been received. Maturity on the bonds will be two years from the date of this letter.
Maturity on the Erosion Control Bond submitted for the project will also be two years from
the date of this letter.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year
bond period. If any punchlist items are noted at that time, you will be contacted to make
repairs. Thanks for your cooperation during the course of this project.
Sincerely,
Albert Samaniego
Construction Inspector
Office Phone: (972) 304-3685
Fax: (972) 304-3570
cc: Michael Garza, P.E., Civil Engineer
Glenn Hollowell, P.E.,Asst. Director of Public Works
Michael Arellano, Chief Building Official
Tim Oates,Deputy Chief/Prevention
Jennifer Miller, Finance Director