Loading...
CF-Village-CS 881012 Texas Department of Health Robert Bernstein, M.D., F.A.CP. 1100 West 49th Street I~obert ^. MacLean, M.D. Commissioner Austin, Texas 78756-3199 Deputy Commissioner {512) 458-7111 Professional Services Hermas L. Miller 0¢tober 12~ 1988 Deputy Commissioner Administration Mr. Sanford W~ Ca~e, P.E~ Ginn, Inc., Consultin~ Engineers 17103 Preston Road, Suite 100 - LB 118 Dallas, Texas 75248 SUBJECT: Water Supply System Improvements City of Coppell - ID No. 0570040 Village Parkway Pump S~a%ion TDH Log No. 810/5 Dallas County~ Texas Dear Mr. Case: We have completed review of ~6 shee~s of drawin~s~ an engineering report and a separately bound volume of speciftca~ions which were submitted for review with your September 30, 1988 letter. These documents describe the construction of ~he City of Coppell's new village Parkway Pump Station and a supportin~ 36 inch pretensioned concrete cylinder (PCCP) supply line which will feed ~his fac/li~¥ from a poin~ o£ connect/on ~o ~he City o£ Dallas Water system. The pump station~ which will be located southeast of the inte~section of Village Parkway and Kimbel Kou~t; will initially consist of a ~ m~ p~est~essed, wi~e-wound, tone,ere ~Found s~oFa~e tank which is now unde~ const~uu~ion; a mete~in~ vault, a 6~ foot by 81.5 pump and control buildin~, three 500 bp, 7,000 ~pm, high service pumps, yard pipin~ plan~ and system controls and an intruder resistant fence enclosure. The pump station site and pump building are configured such that an additional q m~ ~allon reservoir can be constructed in the future and a fourth service pump installed in the exi$%in~ pipin~ In order supply this pump station, the City will construct a 2,200 linear feet, 36 inch diameter, PCCP supply line alon8 Village Parkway from the existin8 City of Dallas rate-of-flow controller at the Sandy Lake Road Pump Station to the new ~ m~ reservoir. Althoush no rechlorination facilities are bein6 provided at this time, we understand that the City is prepared ~o add such facilities in the future if they become necessary. In such an event, rechlorination facilities would be housed in a separate buildin~ Our review has indicated that these facilities were designed in accordance with generally accepted engineering practices and this Department's Standards and we would, therefore, not object to construction. As discussed during our October 11, 1988, telephone conversation, however, the City should obtain a chlorine test kit (if one is not already available) to Hr. Sanford W; Case, P.E. Page Two October 12, 1988 monitor chlorine residuals in the remote parts of its distribution system and be prepared to install rechlorination facilities at the Village Parkway Pump Station before a major problem develops. Please let us know if we can be of further assistance~ Sincerely~ F; G.-(~Jerry) Hidalgo, P.E. Plan Review Branch Division of Water Hygiene FGH/re ocs: ~C~ity of Coppell Dallas County Health Department Public Health Region 5