Loading...
Coppell Ind 2-LR130521 REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 424 3090 Olive Street, Suite 300 REPORT DATE: 05-21-13 Dallas, Texas 75219 REG PROJECT NO. 18520 ATTN: Mr. Kerry Roetzel DATE OBSERVED: 05-07-13 TECHNICIAN: C. Winchester PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Paving: 325-405’S, 25-82’E from NE building corner. Items Observed: Sheet C-2.01 Reference Plans or Notes Used: There were no deviations noted. x The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Ronald F. Reed, P.E. Mr. Thomas Holland CT/jm (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX