CF-Andrew Park 2-LR 950725"Excel Lence by Experience"
PO Box 92548 * Southiake, Texas 76092
CO~LTINQ EIqQINEER8 INs
' ,~vi ronmentsl Assessments
Soils & F~tion~
Construction NaterlaLs Testi~
Coem.erctaL & l~trlst Inspection
(817) 329-0281
FIELD COHPACTION REPORT
PROJECT: Andrew Brown Park, Phase II
LOCATION: Coppe11
JOB #: 95-1451 DATE: 07-25-95 DAY: Tuesday
TIME: 11: 00am
CLIENT: City of Coppell CONTRACTOR: Rodman Excavation
mmmm mmm mmm m m m mmmmmm mlmmmmmmmmmmmmmm e mmm m mmmmmmm m mm m mm mmmm m m mm mmm m
WATER DRY PER-
TEBT PROCTOR CONT. DEN CENT
NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP
Parking Lot:
1. 50' off SW corner
2. 25' off NW corner
3. 40' off NE corner
4. center of pad
FG I 19.8 101.5 95.9
FG I 17.4 100.9 95.3
FG i 19.0 104.5 98.7
FG i 18.5 102.9 97.2
REMARKS:
Ail tests passed.
Minimum Compaction Required:
FG = Final Grade
95%
PROCTORS:
1. Dk Brn Sandy Clay
105.8 PCF @ 17.0% MOISTURE
Jeff Holden
Technician