CF-Andrew Park 2-LR 950112ALPHA TESTING, INC.
2209 Wisconsin St
Suite 1 O0
Dallas, Texas 75229
t214t 620-8911
REPORT OF CONCRETE
COMPRESSION TEST
RODMAN EXCAVATION CO.
FRISCO, TEXAS
DATE:
JANUARY 12, 1995
ANDREW BROWN JR COMM PK
COPPELL, TEXAS
OUR REPORT NO.
94001-43
LOCATION OF CONCRETE PLACEMENT PIERS FOR
FIELD DATA
GOLD FIELD ~4
DATE PLACED 0 1 / 1 2 / 9 5 PLANT 7
TIME 11: 00 DELIVER TICKET NO. 7006381
SLUMP 5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT N/A CEMENT N/A
AIR TEMPERATURE 68 WATER N/A
CONCRETE TEMPERATURE 6 4 FINE AGGREGATE N/A
DATE RECEIVED 01/ 13/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY S. A. ADMIXTURE N/A
MIX DATA SLJBMI'rI'ED BY LATT IMORE
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6- X 12")
Lab. ! Cuitomer Type Piti
No. I No. Cuti~ T~ S~en~h.
~0~ 94001 hAB 0~/19/9! 7 3880
~02~ 94001 BbB 02/09/9~ 28 4360
103~ 94001 LAB 02/09/9~ 28 4650
[04 ~4001' hhB HOhD H
REMARKS
~"-Cylinders made by ALPHA
representative.
[] Cylinders made by Architect's
or Contractor's representative.
~Cylinders picked up by ALPHA
laboratory.
[] Cylinders delivered to ALPHA
laboratory.
[~mpression test results comply with
applicable specifications.
[] CompreSSion test results do no~ comply
with applicable specifications.
TTNER