Loading...
WA9401-CS 940125January 25, 1994 ESTIMATED COST TO EXTEND VARIOUS WATER LINE SIZES TO THE INTERSECTION OF BELTLINE AND LEDBETTER ROAD (NOTE: The overall length assumes that the water line has been extended to the east side of the proposed Blooming Colors Nursery by others) 8" Water Line 12" Water Line 12" Water Line to Fairway 8" Water Line to Ledbetter Quantity Unit Total Quantity Unit Total Quantity Unit Cost Cost Cost Cost Cost -~-~o- 8" Water pip~ 3950 L.F. 25 98,750 150 L.F. 25 3,750 L~80e L.F. 25 12" Water Pipe 0 36 0 3800 L.F. 36 136,800 1LS0 L.F. 36 Conn. to existing pipe 1 each 1,300 1,300 1 each 1,300 1,300 1 each 1,300 8" Valves 4 each 800 3,200 1 each 800 800 4 each 800 12" Valves 0 1,000 0 3 each 1,000 3,000 0 1,000 Fire Hydrant w/VaNe 2 2,000 4,000 2 each 2,000 4,000 2 each 2,000 12" bore ( for 8" pipe) 250 L.F. 100 25,000 250 L.F. 100 25,000 250 L.F. 100 w/pipe Trench Safety 3950 L.F. I 3,950 3950 L.F. 1 3,950 3950 L.F. 1 Plug Pipe 1 each 500 500 1 each 500 500 1 each 500 Air Release Valve 1 each 3,000 3,000 1 each 4,000 4,000 1 each 3,000 139,700 183,100 15% IncidentMs 20,900 27,500 Total Cost $160,600 $210,600 Total Cost per Foot $38.24/L.F. $50.14/L.F. Total Cost [ 5b 170,000,~ # 41,4~ 0 3,2~ O~ 4,000 ~ "3,950 3,000 $17s,2oo RECOMMENDED OPTION My recommendation would be to install the 12" to Fairway Dr. and the 8" to Ledbetter Rd. In the future, this would allow the City to loop the 12" down Fairway Dr. into the existing 12" in Riverchase Dr. Also, in the future, there could be an opportunity to loop the 8" on the north side on Bel~ine to Fairway Dr. I used current bid prices to determine the unit costs. The actual price could be higher or lower when the project is bid. ) ~ ~~ F~/~2'' Water Line , I~- t , ~ . . . ~ ~E ~ N ~" ~- ~ 8" Wa~r Line ~ '..~ 1" = 600'