Tax 2011B-CN130228CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Vanbebber Drive - Tax 2011B CONTRACTOR: CPS Civil, LLC OWNER: City of Coppell CHANGE ORDER NO.: Three (3) DATE: February 28, 2013 1. This change order rectifies final quantities with as -built field conditions, and increases the value of the contract to cover the additional work performed. Item Description Quantity Unit Unit Price Total ADD: 104 Remove & Dispose Ex. 47 SY $8.00 $376.00 Concrete Pavement Remove & Dispose Ex. 105 Concrete Driveways, Alleys 177 SY $8.00 $1,416.00 & Sidewalks 109 8" Reinforced Pavement 72 SY $35.00 $2,520.00 with Curb 8" Stamped Concrete 110 Pavement with Integral 7.56 SY $60.00 $453.60 Color 111 6" Reinforced 142 SY $37.00 $5,254.00 Driveway /Alley Pavement 112 4" Concrete Sidewalk 57 SY $30.00 $1,710.00 114 Variable Height Ret. Wall 42 LF $40.00 $1,680.00 w /Integral Sidewalk 121 10' Curb Inlet 0.50 EA $3,000.00 $1,500.00 124 18" Reinforced Concrete I LF $50.00 $50.00 Pipe (CL III) 128 8" PVC C -900 DR -14 37 LF $50.00 $1,850.00 Water Line Total Additions Delete: 146 $16,809.60 Trench Safety for All (88) LF $1.00 ($88.00) Utilities CITY OF COPPELL CHANGE OR EXTRA WORK ORDER Total Deletions ($88.00) Total Revision to Contract Amount: $16,721.60 Original contract amount $588,100.00 Net increase in contract amount $16,721.60 Previously approved changes $21,086.00 Revised contract amount $625,907.60 Cumulative increase in TOTAL change order amount (Percentage) 6.4% Net increase in contract time of completion 14 Revised Contract time of completion 136 Calendar Da s The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord Agreed to zo� --/- 7,��- J� Accepted City Da e