Loading...
WA9401-CS 940121WATER AND SEWER FUND GRAPEVINE CREEK 1 & 2, UNENCUMBERED FUNDS GRAPEVINE CREEK 3 & 4 WRANGLER DRIVE 12" WATER LINE SOUTH BELTLINE - SOUTHWESTERN TO LAKESHORE IRVING WATER LINE INFLOW/INFILTRATION ANALYSIS 2 ND GROUND STORAGE TANK TOTAL FUNDED PROJECTS UNALLOCATED FUNDS - SERIES 1985 UNALLOCATED FUNDS - SERIES 1991 UNALLOCATED FUNDS - SERIES 1992 COST OF ISSUANCE - SERIES 1992 TO BE PAID FROM INTEREST INCOME TOTAL SURPLUS FUNDS RATE OF FLOW CONTROLLER PAY OFF TRA DEBT L$704,000 lO0,O00c~c,'v~ 144,0004 I ~"~-, --P190,000 140,000 19,890 / /"'~7250'000~''' 547,890 2,199 49,849 27,106 (36,639) ,42,515 390,000 250,000 TOTAL PROPOSED USE OF EXCESS OPERATING FUNDS 640,000 82,230,405 TOTAL FUNDS AVAILABLE FOR CURRENT PROJECTS