Loading...
CF-Andrew Park 2-LR 940602 (7)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR RODMAN EXCAVATION, INC. FRISCO, TEXAS DATE 06/02/94 PROJECT ANDREW BROWN JR. COMMUNITY PARK PHASE COPPELL, TEXAS OUR REPORT NO. 94001-2S WEATHER: PARTLY CLOUDY TEMPERATURE RANGE: 82 ALPHA Repre~entative: J . S. TO: 85 THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE, TO MONITOR PIER EXCAVATIONS AND PERFORM CONCRETE TESTING. SEVEN PIERS WERE DRILLED AND PLACED WITH CONCRETE. SET OF FOUR CYLINDERS FROM THE PLACEMENT. THE TECHNICIAN CAST ONE IN ADDITION, TECHNICIAN CAST TWO SETS OF FOUR CYLINDERS FROM CONCRETE PLACED FOR PAVEMENT ON THIS DATE. ALL TEST RESULTS APPEARED TO COMPLY WITH PROJECT SPECIFICATIONS. (,) PIER NUMBERS BEGIN WITH NUMBER ONE AT BACKSTOP END ALONG FIRST BASE LINE AND INCREASE CLOCKWISE TOWARDS THIRD BASE LINE. RESULTS OF PIER MONITORING ARE SHOWN ON THE ENCLOSED REPORTS. COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. CONCRETE ALL REQUESTED FIELD TESTS WERE PERFORMED AND TEST RESULTS WERE REPORTED TO THE CONTRACTOR'S REPRESENTATIVE. TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING. net