DAILY FIELD REPORT
TESTED FOR
RODMAN EXCAVATION, INC.
FRISCO, TEXAS
DATE 06/02/94
PROJECT
ANDREW BROWN JR.
COMMUNITY PARK PHASE
COPPELL, TEXAS
OUR REPORT NO.
94001-2S
WEATHER: PARTLY CLOUDY
TEMPERATURE RANGE: 82
ALPHA Repre~entative: J . S.
TO:
85
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE, TO MONITOR PIER EXCAVATIONS AND PERFORM CONCRETE
TESTING.
SEVEN PIERS WERE DRILLED AND PLACED WITH CONCRETE.
SET OF FOUR CYLINDERS FROM THE PLACEMENT.
THE TECHNICIAN CAST ONE
IN ADDITION, TECHNICIAN CAST TWO SETS OF FOUR CYLINDERS FROM CONCRETE
PLACED FOR PAVEMENT ON THIS DATE. ALL TEST RESULTS APPEARED TO COMPLY WITH
PROJECT SPECIFICATIONS.
(,) PIER NUMBERS BEGIN WITH NUMBER ONE AT BACKSTOP END ALONG FIRST BASE
LINE AND INCREASE CLOCKWISE TOWARDS THIRD BASE LINE.
RESULTS OF PIER MONITORING ARE SHOWN ON THE ENCLOSED REPORTS.
COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.
CONCRETE
ALL REQUESTED FIELD TESTS WERE PERFORMED AND TEST RESULTS WERE REPORTED TO
THE CONTRACTOR'S REPRESENTATIVE.
TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING.
net