Loading...
ST0301A-CS130531 T H E C 1 T Y O F COPPELL q A ` May 31, 2013 Tery Chapman C/O JRJ Paving RE: Notice of Maintenance Bond Inspection—Third Notice Project#ST 031-01 Bethel Rd,Phase A Dear Mr. Chapman: An inspection of the referenced project should be scheduled by you with representatives of the City of Coppell prior to the expiration of the two-year Maintenance Bond. This request was made in writing to your predecessor, Marty Murphy on April 18,2012 and on May 9, 2012. To my knowledge, no attempt to contact City of Coppell was made after some minor repairs were attempted. Issues remain that need to be resolved under the terms of the maintenance bonds held on the project. Please call me at 972-304-3684 to let me know when you can meet with me to walk the limits of the project with City of Coppell personnel. Since, ely, / Larry4 avis Construction Inspe tor cc: Ken Griffin, P.E., Director of Engineering&Public Works Keith Marvin, P.E., Project Engineer Glenn Hollowell, P.E., Asst. Director of Public Works 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673