ALPHA TESTING, INC. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF PIER INSPECTION TESTED FOR: RodmanExcavation, Frisco, Texas Inc. DATE: 06/02/94 OUR RE~ORT NO.: 94001-25B ARCHITECT: Mesa Group, Inc. PROJECT: Andrew Brown Jr. C~,,,~nity Park Phase II Coppell, Texas PIER INFORMATION: Pier Designation , Date Drilled Date Concrete Placed Shaft Diameter - Design / Actual, inches Bell Diameter - Design / Actual, inches Top Elevation - Design / Actual Bottom Elevation - Design / Actual Deviation from Design - Bottom Elevation (ft ~) Steel Reinforcement Used: Vertical (No. & size) Ties (No. & spacing) Splices (No. & location) Length of casing used, ft. Estimated Allowable Bearing Capacity, ksf Total Pier Length Drilled, fi: ~ SUP~ ELL~ REMARKS GENERAL CONTRACTOR:RO(~an Excavation PlER CONTRACTOR: Long & Long Pier Drilling CONCRETESU~L~ER: Lattimore 5 6 7 06/02 06/02 06/02 06/02 06/02 06/02 18" / 18" 18- / ~8" ~8,, / ~8" / 36" / 36" 36,, / 36" 36,, / 36" / 96.0 / 96.0 96.0 ! 96.0 96.0 [ 96.0 / 85-0 ! 84.8 85.0 / 84.4 85.0 / 84.8 / 0.2 0.6 0.2 6~5's 6~5's 6~5's #3@8" #3@8" :!1'3@8" N/A N/A N/~ N/A N/A N/A 14.8 15.2 14.8 99.6 99.6 99.6 See daily field report.