Loading...
FEMA-PT030916r va 0 ti �n w v C) L0 co co a CONSTRICTION PLANS FOR 2003 DRAINAGE STRUCTURE R NORTHWEST DALLAS COUNTY FLOOD CONTROL DISTRICT l6� / *.::...... ...........! 13RIAN J. LaFOY i k 114 NATHAN D. MAIER CONSULTING ENGINEERS, INC. Two Northpark / 8080 Park Lane / Suite 600 Dallas, Texas 75231 1 (214) 739 -4741 GENERAL NOTES 1. All materials and procedures shall comply with the Contract Documents, General Guidelines, and Specifications which form part of the contract i ocuments for this project. 2. All removed or excess materials shall be legall) disposed off site. 3. No existing utilities in the vicinity of the propo ;d work are evident on record documents. Contractor shall verify locations prior to commencing work. :: shall be the responsibility of the Contractor to protect all utilities during in the construction o, this project. 4. Contractor shall coordinate location of existirg ,'r igation with the golf course. Any necessary repairs of irrigation facilities shall be coordinated with the golf course and performed immediately. The cost of any necessary irrigation protection or repairs shall h =_ the responsibility of the contractor. 5. Any work impacting the golf cart path shall bt: coordinated with the golf course. 6. Golf course etiquette shall be followed by all ii lividuals involved in the work associated with this project whenever reasonable. 7. All barricades, warning signs, lights, devices, e+ -, for the guidance and protection of traffic and pedestrians must conform to the installation st )wn in the latest version of the Texas Manual on Uniform Traffic Control Devices as currently arr, nded. 8. The water level in the ponds may not be lowe id more than 2 feet from the normal water level. 9. The limits of disturbed area shall be coordinai J with the golf course and the Engineer prior to commencing work. Limits of the disturbed area :aholl be staked by the Contractor. 10. Work associated with Gabion Spillways Number., 1 and 4 as well as work associated with glory holes in the ponds shall be accessed across cart path. Only small equipment only will be allowed for this work. J :' OBER, 2003 9 a i FILL TOP 6" OF REPAIRED AREA WITH CLAY CAP AND SOD TO MATCH EXISTING EXISTING GABION SPILLWAY WITH - - -- - CONCRETE CAP 1 1 SPILLWAY EROSION REPAIR ETAIL NO SCALE TOP OF BANK? EXISTING GROUND REMOVE AE.L LOOSE SELECT BACKFILL I "ROM BEHIND GABION SPILLWAY. LINE GABIONS AND SURROUNDING MATERIAL WITH MIRAFI 14ON FILTER MATERIAL OR EQUAL: REPLACE BACKFILL AND COMPACT. F.L. SWALE N. EXISTING GABION SPILLWAY WITH CONCRETE CAP k SPILLWAY 1) EROSION REPAIR DETAIL FILL EXISTING SWALE AS SHOWN IN EXISTING CONCRETE CROSS SECTION. CART PATH s - 1 EXTEND PROPOSED PV------ TO EXISTING PVC PIPE TOP OF SPILLWAY MAINTAINING A POSITIVE FLOW. MATCH EXISTING PVC CLASS AND SIZE. MATCH SLOPE OF SPILLWAY. NO SCALE EXISTING GABION SPILLWAY IMTH CONCRETE CAP CROSS SECTION "A " — "A" NO SCALE 300 150 0 300 600 SCALE FEET \�F °r QO �QQ ' ° °' _° 'yo 2 h 4 v °v AQ O� Q' O. ,y° PLACE GRATE OVER GLORY TAIL HOLE OPENING (SEE DE CART THIS SHEET) GE 6 GABION SPILLWAY #2 ` REMOVE & REPLACE i' / PLACE GRATE OVER GLORY ;n HOLE OPENING (SEE DETAIL J� 2 ALTERNATE #1 2 -7'X5' REMOVE SILT FROM BOX CULVER BOX CULVERTS ST. LouIS & BELT UNE ROAD ACCESS & STAGING LOCATION FOR WORK ON GABION SPILLWAY #2 GABION SPILLWAY #1 - REPAIR EROSION BEHIND SPILLWAY SEE DETAIL THIS SHEET SUMP #2 W /GLORY HOLE '40'. SWALE . 0" RCP i \\ I THIS SHEET) GABION SPILLWAY #6 60f RCP 9 50' WALE g ..... c �� DRNE SWALE WITH PVC PLACE GRATE OVER GLORY PIPE CULVERTS HOLE OPENING (SEE DETAIL THIS SHEET ITM�sTERN RAILROAD .,163 GABION SPILLWAY #5 GOLF CART FACILITY \ CLUBHOUSE EXISTING RCP GLORY HOLE (VARY IN DIAMETER) .j a- V 3/8" REBAR GRATE ® 9" O.C.E.W. /4" CLR. PLACE #5 REBAR TYI'• ® 9" O.C.E.W. CROSS SECTION "A" — "A" GRATE DETAIL ON GLORY HOLE SCALE: NONE 18 OUTLET j•% s ` STRUCTURE I SPILLWAY #4 - EROSION BEHNNL AY, EXTEND PVC OVER SPILLWAY INLET STRUCTURE BENCHMARKS: BM #1 cut in top of curb on east side River Chose Drive 50'± south of centerline of intersection of Westchester Dr. Elev. = 453.00 BM #2 cut in top of curb on east side of Riverchase Dr. 175'± north of Stonecrest Drive. Elev. = 444.66 , i�'�t� A•••E'rgiS'4 r 1V7 r : .......:,., BRIAN J LaFOY .... ... 89363' i 1 ( O.• Q,' i 11 O,r� /CENSE G� S revisions date NATHAN D. MAZER CONSULTING (ENGINEERS, INC. I� A !nb nureats�;, Two North�ark t SOI!�? Park Lane 1 Suite 6CXi Dallas, Texa: "v'.= =311 f214p 734 4741 de r re ;7rawn __ _. __ 1.__ '5J� �B . g...ca date— 'rie name __ .._�.- 1 1� � 'io0' 4,0/03 KEYMAF LEGEND z Riverchase Golf Course hole number 15, 10 Property Line * GOLF COURSE & GOLF COURSE FACILITIES NOT TO SCALE. FOR REFERENCE ONLY 2 - 60" RCP 18 OUTLET j•% s ` STRUCTURE I SPILLWAY #4 - EROSION BEHNNL AY, EXTEND PVC OVER SPILLWAY INLET STRUCTURE BENCHMARKS: BM #1 cut in top of curb on east side River Chose Drive 50'± south of centerline of intersection of Westchester Dr. Elev. = 453.00 BM #2 cut in top of curb on east side of Riverchase Dr. 175'± north of Stonecrest Drive. Elev. = 444.66 , i�'�t� A•••E'rgiS'4 r 1V7 r : .......:,., BRIAN J LaFOY .... ... 89363' i 1 ( O.• Q,' i 11 O,r� /CENSE G� S revisions date NATHAN D. MAZER CONSULTING (ENGINEERS, INC. SITE MAP NORTHWEST DALLAS COUNTY FLOOD CONTROL DISTRICT THE CITY OF COPPELL DALLAS COUNTY. TEXAS !nb nureats�;, Two North�ark t SOI!�? Park Lane 1 Suite 6CXi Dallas, Texa: "v'.= =311 f214p 734 4741 de r re ;7rawn __ _. __ 1.__ '5J� �B . g...ca date— 'rie name __ .._�.- 1 1� � 'io0' 4,0/03 KEYMAF !nb nureats�;, T_ 6' -0" TYP. 3' -0' 76' -6"' ANCHORAGE HEEL LIMITS 3 0 J REMOVE & DISPOSE OF EXISTING STRUCTURE SP LLI WAY #2 PLAN MEW SCALE: 1 "= 5' —6'-0' CROSS SECTION A -A SCALE: 1' =5' 3" THICK 3000 PSI CONCRETE CONCRETE CAP D TAIL SCALE: 1"=l' CHAMFER I TEMPORARY FORM �PjtiOF tFgs1 ;* r ..RRIAN J. LaFOY _ revisions EXISTING SURFACE GABIONS MUST BE TIED IN THIS MANNER AT EACH STEP OF CONSTRUCTION: 1. INITIAL ASSEMBLY 2. TYING TO ADJACENT GABIONS ALONG ALL CONTACTING EDGES 3. TYING OF LID TO SIDES 4. TYING OF LID TO ALL DIAPHRAGMS 5. RE -TYING OF THE CUT GABION FIGURE 1: TYING METHOD INNER TIE WIRES SHALL BE PLACED HORIZONTALLY IN EACH CELL EVERY 12" OF VERTICAL HEIGHT CONNECTING THE FRONT AND BACK FACES AND ANY UNSUPPORTED FACE LENGTHWISE. FIGURE 2: TIE WIRE INSTALLATION METHOD date i ry NATHAN C). WIER CONSULTING EN�`?4EEE; VC Two Northpark 18080 Park Lane si. = z, g Dallas, Texas 75231 / (214) 739,,47p4s NORTHWEST DALLAS COUNTY FLOOD CONTROL DISTRICT THE CITY OF COPPELL DALLAS COUNTY TEXAS iesign drawn scale dot file name BJL MEB 1 ' = 300' 1 0/'.3 KEYMAP 3 Y j a M O O O O N O ODD 3 `v 0 u v 3 n 0 0 PrL NATHAN D. MAIER CONSULTING ENGINEERS, INC. Two Northpark / 8080 Park Lane / Suite 600 Dallas, Texas 75231 / (214) 739 -4741 m * Riverchase Golf Course hole number Property Line IRSE & GOLF COURSE FACILITIES CALE. FOR REFERENCE ONLY )UTLET STRUCTURE — 42" RCP INLET STRUCTURE BENCHMARKS: BM #1 cut in top of curb on east side River Chase Drive 50'± south of centerline of intersection of Westchester Dr. Elev. = 453.00 BM #2 cut in top of curb on east side of Riverchase Dr. 175'± north of Stonecrest Drive. Elev. = 444.66 NORTHWEST DALLAS COUNT FLOOD CONTROL DISTRICT THE CITY OF COPPELL job number 87 -150.E 9' -0" 4' -6" TYP. 3 S -0" i - i 4' -6" - 1 - 9' -6" T 20' -O" 434.75 1:1 SLOPE (TYP.) �3" CONCRETE CAP ON TOP MATCH TOP OF PROPOSED 433.25 OF GABION BASKETS SYMM SPILLWAY TO EXISTING SPILL WAY 431.75 PROPOSED 12" THICK GABION MATTRESS SPILLWAY I PROFILE ANCHORAGE HEEL BEYOND SCALE: 1 " =5' PROPOSED FILTERC FABRIC MIRAFI 140N OR EQUAL Iw i GABIONS MUST BE TIED IN THIS MANNER AT EACH STEP OF CONSTRUCTION: 1. INITIAL ASSEMBLY 4' -0" 2. TYING TO ADJACENT GABIONS ALONG ALL CONTACTING EDGES 3. TYING OF LID TO SIDES 4. TYING OF LID TO ALL DIAPHRAGMS 5. RE -TYING OF THE CUT GABION FIGURE 1: TYING METHOD 3" THICK 3000 PSI CONCRETE 3 6 CAP W/BROOM FINISH 3/4" CHAMFER j F 3" (TYP.) —Ll— 4 q. TEMPORARY CONCRETE CAP -SEE FORM DETAIL THIS SHEET PROPOSED GABION - B ON SPILLWAY :— -•TT - - U/-MATCH LOCATION AND ELEVATION TEMPORARY OF EXISTING STRUCTURE FORM FLOW ORMAL WATER SURFACE CONCRETE CAP DETAIL w SCALE: 1 " =1' PROPOSED FILTERC FABRIC MIRAFI 140N OR EQUAL Iw i GABIONS MUST BE TIED IN THIS MANNER AT EACH STEP OF CONSTRUCTION: 1. INITIAL ASSEMBLY 4' -0" 2. TYING TO ADJACENT GABIONS ALONG ALL CONTACTING EDGES 3. TYING OF LID TO SIDES 4. TYING OF LID TO ALL DIAPHRAGMS 5. RE -TYING OF THE CUT GABION FIGURE 1: TYING METHOD PROPOSED 12" THICK GABION MATTRESS CONCRETE APRON AND WALL BEYOND lowJ_YE'L'aJI:V ELVl1W l • �: FILL VOID IN SWALE. GRADE AS NEC. PLACE 6" CLAY CAP IN SWALE AREA AND SOD TO MATCH EXISTING CONCRETE \ CAP - SEE DETAIL THIS SHEET �-0. \ FL( i- ------------ � EXISTING CONCRETE CART PATH —III III —Ili_ n i- w .Ex�snNG_QVC.PIPE #5 GR 60 18 "x6" 90" _. Oo r-L CARS ® 1.0' O.C. #5 GR60 BAR CONTINUOUS- SPILLWAYS 1 �4 date E ORDER 1 2 4 C INNER TIE WIRES SHALL BE PLACED HORIZONTALLY IN EACH CELL EVERY 12" OF VERTICAL HEIGHT CONNECTING THE FRONT AND BACK FACES AND ANY UNSUPPORTED FACE LENGTHWISE. FIGURE 2: TIE WIRE INSTALLATION METHOD EXTEND PVC PIPE TO TOP OF SPILLWAY MAINTAINING A POSITIVE FLOW. MATCH EXISTING PVC CLASS AND SIZE. 12 "x12` 3000 PSI CONC. ANCHOR BEAM PROPOSED GABION SPILLWAY - MATCH LOCATION AND ELEVATION OF EXISTING STRUCTURE %Li 3. EXISTING • CONC. • •• • REMAIN IN PLACE • BAR CONTINUOUS CROSS SECTION PROPOSED FILTER ,�jFABRIC MIRAFI 140N OR EQUAL #5 GR 60 DOWELS 1.0' O.C. -1 6" 18" NORTHWEST DALLAS CdO N- 7 FLOOD CONTROL DISTRICT THE CITY OF COPPELL DALLAS COUNTY TEXAS lesign drawn I scale date_ BJL MEB I AS SHOWN 2/04 file name job number ILLWAY 4Qc 87 -150.E 3 6 SYMM. 1 B IF 69' -0" CONCRETE WALL LIMITS :— -•TT - - PROPOSED 12" THICK GABION MATTRESS CONCRETE APRON AND WALL BEYOND lowJ_YE'L'aJI:V ELVl1W l • �: FILL VOID IN SWALE. GRADE AS NEC. PLACE 6" CLAY CAP IN SWALE AREA AND SOD TO MATCH EXISTING CONCRETE \ CAP - SEE DETAIL THIS SHEET �-0. \ FL( i- ------------ � EXISTING CONCRETE CART PATH —III III —Ili_ n i- w .Ex�snNG_QVC.PIPE #5 GR 60 18 "x6" 90" _. Oo r-L CARS ® 1.0' O.C. #5 GR60 BAR CONTINUOUS- SPILLWAYS 1 �4 date E ORDER 1 2 4 C INNER TIE WIRES SHALL BE PLACED HORIZONTALLY IN EACH CELL EVERY 12" OF VERTICAL HEIGHT CONNECTING THE FRONT AND BACK FACES AND ANY UNSUPPORTED FACE LENGTHWISE. FIGURE 2: TIE WIRE INSTALLATION METHOD EXTEND PVC PIPE TO TOP OF SPILLWAY MAINTAINING A POSITIVE FLOW. MATCH EXISTING PVC CLASS AND SIZE. 12 "x12` 3000 PSI CONC. ANCHOR BEAM PROPOSED GABION SPILLWAY - MATCH LOCATION AND ELEVATION OF EXISTING STRUCTURE %Li 3. EXISTING • CONC. • •• • REMAIN IN PLACE • BAR CONTINUOUS CROSS SECTION PROPOSED FILTER ,�jFABRIC MIRAFI 140N OR EQUAL #5 GR 60 DOWELS 1.0' O.C. -1 6" 18" NORTHWEST DALLAS CdO N- 7 FLOOD CONTROL DISTRICT THE CITY OF COPPELL DALLAS COUNTY TEXAS lesign drawn I scale date_ BJL MEB I AS SHOWN 2/04 file name job number ILLWAY 4Qc 87 -150.E