Loading...
CF-Andrew Park 2-LR 940520 (2)ALPHA TESTING, INC. 2209 Wisconsin St. Suite 100 Dallas. Texas 75229 (214) 620-8911 REPORT OF CONCRETE COMPRESSION TEST TESTED FOR RODNAN EXCAVATION, INC. DATE= 05/20/94 FRISCO, TEXAS PROJECT ANDREW BROWN 3R. OURREPORTNO. 94001-22 COHHUNITY PARK PHASE II COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT RUNNING TRACK 375'E & 205'N OF POINT '0" ON LC-1 DATE PLACED 05/20/94 PLANT 7 TIME 2: 41 DELIVER TICKET NO. 1323 SLUMP 4.5 # MIX PROPORTIONS (SSD) AIR CONTENT 5 CEMENT AIR TEMPERATURE 85 WATER CONCRETE TEMPERATURE 89 FINE AGGREGATE DATE RECEIVED 05/21/94 COARSE AGGREGATE FIELD DATA SUBMITTED BY AW ADMIXTURE MIX DATA SUBMII'TED BY LATT COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12") Lab. Customer Type Dire A~e Coml~emive No. No. Curing Te~ted D1¥$ S~'ee~th, Psi 33 94001 LAB 05/27/94 7 3140 34 94001 LAB 06/17/94 28 3650 35 94001 LAB 06/17/94 28 3630 36 94001 t_AFl HOlD [spec.,ca~,o,*,s 28 3000 REMARKS ~/Cylinders made by ALPHA representative. [] Cylinders made by Architect's or Contractor's representative, ~inders picked up by ALPHA laboratory. [] Cylinders delivered to ALPHA mrat°fy' pression test results comply with applicable specifications. [] Compression test results do nol comply with applicable specifications. ,..,E. IF OTHER