Loading...
ST9902-CS010619WEST SANDY LAKE ROAD PROJECT ~ ,~,~.'~ ~ Meeting w/City of Coppell ~ 4 ~St ~[$ Tuesday, June 19, 2001 ~l~ ~a~,' ~ AGENDA 1. Project Status ~ ~ ~ ~ ~ 2. Prelimina~ Schematic ~~ ~ ~.~ a. Operation of intemection at Denton-Tap Road (traffic movement) b. Alignment (Denton-Tap Rd. - Coppell Rd. South) i. Constraints 1. transmission poles on south side of roadway 2. minimize tree removal ii. Transition from existing section (6-lanes?) to 4-lanes (west of Denton- Tap Road) 1. Similar to East Sandy Lake Road design? iii. ~ requirements iv. Median Openings c. Alignment (Coppell Rd. South- Coppell Rd. No~h) i. Constraints 1, existing bridge location ii. Intersection- Coppell Road South and No~h 1. design speed 2. options for intemection geometri~ 3. sight distance 4. ~nsultant and schedule for Coppell Road South iii. Median Openings d. Alignment (Coppell Rd. No~h- SH 121) i. Constraints 1. transmission poles on no~h side of roadway ii. Transition from 4-lane to 6-lane roadway section east of State Road iii. Intemection at State Rd. (Freepo~ Parkway) and Royal Lane 1. alignment 2. configuration (3 or 4-legs) iv. Median Openings 3. LandScape Concepts 4. Schedule - Schematic Design