ST9902-CS010619WEST SANDY LAKE ROAD PROJECT ~ ,~,~.'~ ~
Meeting w/City of Coppell ~ 4 ~St ~[$
Tuesday, June 19, 2001 ~l~ ~a~,' ~
AGENDA
1. Project Status ~ ~ ~ ~ ~
2. Prelimina~ Schematic ~~ ~ ~.~
a. Operation of intemection at Denton-Tap Road (traffic movement)
b. Alignment (Denton-Tap Rd. - Coppell Rd. South)
i. Constraints
1. transmission poles on south side of roadway
2. minimize tree removal
ii. Transition from existing section (6-lanes?) to 4-lanes (west of Denton-
Tap Road)
1. Similar to East Sandy Lake Road design?
iii. ~ requirements
iv. Median Openings
c. Alignment (Coppell Rd. South- Coppell Rd. No~h)
i. Constraints
1, existing bridge location
ii. Intersection- Coppell Road South and No~h 1. design speed
2. options for intemection geometri~
3. sight distance
4. ~nsultant and schedule for Coppell Road South
iii. Median Openings
d. Alignment (Coppell Rd. No~h- SH 121)
i. Constraints
1. transmission poles on no~h side of roadway
ii. Transition from 4-lane to 6-lane roadway section east of State Road
iii. Intemection at State Rd. (Freepo~ Parkway) and Royal Lane 1. alignment
2. configuration (3 or 4-legs)
iv. Median Openings
3. LandScape Concepts
4. Schedule - Schematic Design