Loading...
WA9401-CS 940106DUPLICATE ,-, COPPELL PUBLIC WORKS MEMORANDUM 1994 January 6, 1994 TO: FROM: RE: Jim Witt, City Manger ~ Steven G. Goram, Director of Public W East Beltline 12" Water Line As per your request, staff has calculated the cost for the inslallation of a 12" water line on East Beltline Road from the east property line of the Blooming Colors plat to Ledbetter Road. Today's cost for installing a 12" water line has been calculated at $205,000.00 for 3880 linear feet. The previous cost estimate for this in~,~llation was ailwoximaldy $170,(Xl0.00 for 4900 linear feel. The total number of linear feet has been revised to take into Even though the amount of linear feet has been reduced by apFoxima~y 10IX), the cost installation has risen based on the new markit value for constn~ion. Staff sixlie with Dallas Water Utilities, who has coordinated several municipal projects of this m~niU~. They ~ that currently 12" water line projects ate being bid at approximately $,f~.00 perlinem*fooL this type of construction. The cost of $205,000.00 includes nil labor and materials and will relocate the water services of the Long Branch (Johnny Thompson) and Lone Star businesses from the temporary services presently connected. Should you require any additional information regarding this matter, please !e~ me know. P sz.r r"/""' ";"' · , ,,o I,u. t f . /~ ,~,,, 19~ ,,,,, 7,,/,-~ ... t