ST9902-CS130605 T H E • C I T Y • O F
COPPELL
*
^g.
A E �� q
June 5, 2013
Louie Tiseo, Secretary/Treasurer
Tiseo Paving Company
PO Box 270040
Dallas TX 75227
RE: Construction Contracts for West Sandy Lake Rd, Phase 2A& 2B
(Denton Tap Rd to N. Coppell Rd)
Dear Mr. Tiseo:
The above referenced contract was awarded by Council on May 28, 2013. Enclosed are
three (3) contracts for you to sign and return to the Engineering Department. After being
fully executed, an original contract will be sent back to you for your records.
If you have any questions or need any additional information, please call me at your
convenience.
Sincerely,
Keith R. Marvin, P.E.
Project Engineer
972-304-3681
kmarvina,coppelltx.gov
Enclosures
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673