Loading...
CF-Andrew Park 2-LR 940509 (6)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR RODMAN EXCAVATION, INC. FRISCO, TEXAS DATE 05/09/94 PROJECT ANDREW BROWN JR. COMMUNITY PARK COPPELL, TEXAS PHASE II OUR REPORT NO. 94001-18 WEATHER: RAINY TEMPERATURE RANGE: 73 ALPHA Representative: J . S. TO: 7S THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE, TO MONITOR PIER EXCAVATIONS. FOURTEEN PIERS WERE DRILLED AND PLACED WITH CONCRETE. ONE SET OF FOUR CYLINDERS FROM THE PLACEMENT. THE TECHNICIAN CAST (~) PIER NUMBERS BEGIN WITH NUMBER ONE AT EDGE OF 8ACK STOP ON LINE AND RUN CLOCKWISE TO END AT EDGE ON THIRD BASE LINE. RESULTS OF PIER MONITORING ARE SHOWN ON THE ENCLOSED REPORTS. COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. FIRST BASE CONCRETE ALL REQUESTED FIELD TESTS WERE PERFORMED AND TEST RESULTS WERE REPORTED TO THE CONTRACTOR'S REPRESENTATIVE. TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING. ~)av~ cl/P ./SLet't net-