Loading...
CF-Andrew Park 2-LR 940509 (2)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF PIER INSPECTION TESTED FOR: Rcx:lman Excavatica%, Inc. Frisco, Texas DATE: 05/09/94 OUR REPORT NO.: 94001-18A ARCHITECT: M.e~a G:oup, Inc. PROJECT: PIER INFORMATION: Pier Designation , Date Drilled Date Concrete Placed Shaft Diameter - Design / Actual, inches Ground Surface Elevation Top elevation - Design / Acutal, ft Bottom Elevation - Design / Actual, ft Deviation from Design - Bottom Elevation (fl _+) Steel Reintorcemenl Used: Vertical (No. & size) Ties (No. & spacing) Splices (No. & location) Length of casing used, tt Depth to Bearing Strata, ft Penetration of Pier into Bearing Strata, ft Total Pier Length, ff REMARKS GENERAL CONTRACTOR:Rodii'Ei~ Excavatio~ Andrew Brown Jr. C~,,,~nity Park Phase II PIER CONTRACTOR: Long & Long Pier Drilling Coppel 1, Texas CONCRETE SU~LIER: Lattimore Northeast baseball ~e~d 1 2 3 4 05/09 05/09 05/09 05/09 05/09 o5/o9 o5/09 05/09 18" / 18" 18" ! 18" 18" / 18" 18" / 18" 36" 36" 36" 36" 36" 36" 36" 36" 96.0 / 96.0 96.0! 96.0 96.0 / 96.0 96.0 / 96.0 85.0 / 84.8 85.0/ 84.9 85.0/ 85.0 85.0 / 85.0 0.2 0.1 0.0 0.0 6~5's 6~5's 6~5's 6~5's N/a N/a .la .la N/A N/A N/A N/A N/A N/A N/A N/A 14.8 14.7 14.6 14.6 99.6 99.6 99.6 99.6 ALPHA TE STI N ~C~-I~L~- ~vid P.~ * See daily field report.