Loading...
CF-Andrew Park 2-LR 940216ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: RODMAN EXCAVATION, INC. FRISCO, TEXAS DATE: 02/16/94 PROJECT; ANDREW BROWN JR. COMMUNITY PARK PHASE II COPPELL, TEXAS OUR REPORT NO. 94001-7 TEST DATA: i .Es. .0,.,0 o,,,.- .A.,....A. ,...Ac. '" ;%% I :i NO / DATE NUMiil MOIITUII !OIY DINIITY MOIITUII~ DIY pCF Y COMPACTiONPII CCNT COMMENTe I ll 02/16 SG 3 18.2 104.7 21.5 103 98 2-A 12 02/16 SG 3 18.2 104.7 21.6 102 98 2-A 13 02/16 SG 1 12.6 117.3 16.0 113 96 2-A 14 02/16 FG-2 3 18.2 104.7 21.0 101 96 i-A 15 02/16 FG-2 2 2i.4 97.4 22.3 97 100 1-A 16 02/16 FG-2 3 18.2 104.7 19.7 104 99 1-A 17 02/16 FG-2 3 18.2 104.7 21.9 103 98 1-A TEST LOCATION: 11 50' S. & 175' E. OF HOME PLATE S.E. BALLFIELD CENTER FIELD 12 APPROXIMATELY 150' m. OF RESTROOM AREA SIDEWALK 13 APPROXIMATELY 100' 5. & 200' W. OF HOME PLATE S.W. BALLFIELD 14 APPROXIMATELY 175' N. & 175' E. OF HOME PLATE N.E. BALLFIELD 15 APPROXIMATELY 200' m. OF POINT "R" (PLAZA AREA) SIDEWALK 16 APPROXIMATELY 125' W. & 225' N. OF HOME PLATE N.W. BALLFIELD 17 100' E. & 75' N. OF HOME PLATE N.E. BALLFIELD 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D, RETEST