CF-Andrew Park 2-LR 940221ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas. Texas 75229
(214) 620-8911
REPOHT OF FIELD
COMPACTION TESTS
TESTED FOR:
RODMAN EXCAVATION, INC.
FRISCO, TEXAS
DATE:
02/21/94
PROJECT;
ANDREW BROWN JR.
COMMUNITY PARK PHASE
COPPELL, TEXAS
II
OUR REPORT NO.
94001-8
TEST DATA:
i TEST DATE loll IO OPTIMUM MAXIMUM LAB IN PLACI IN PLACI
MOiITUli DNY OXNIITY MOIITUII DRY OXMIITY ~ FIB CINT COMMENTe
i NO NUMIll ~ PCP ~ PCP COMPACTION
t 20 02/21 FG-3 3 18.2 104.7 21.2 104 99 1-A
21 02/2i FG-3 2 21.4 97.4 23.0 99 102 1-A
22 02/21 FG-3 3 18.2 104.7 20.8 104 99 1-A
23 02/21 FG-2 2 21.4 97.4 23.5 99 102 1-A
24 02/21 FG-2 3 18.2 104.7 21.3 103 99 1-A
25 02/21 FG-2 2 21.4 97.4 25.3 95 98 1-A
I
26 02/21 FG-2 3 18.2 104.7 21.3 100 I 95 1-A
TEST LOCATION:
20 APPROXIMATELY 100' S. & 200' E. OF HOME PLATE S.E. 8ALLFIELD
21 APPROXIMATELY 200' N. & 75' E. OF HOME PLATE S.W. 8ALLFIELD
22 APPROXIMATELY 75' E. & 80' N. OF HOME PLATE N.W. 8ALLFIELD
23 APPROXIMATELY 50' N. & 50' W. OF HOME PLATE N.E. 8ALLFIELD
24 APPROXIMATELY 150' N. OF POINT "R" (PLAZA AREA) SIDEWALK
25 APPROXIMATELY 150' S. OF POINT "R" (PLAZA AREA) SIDEWALK
26 APPROXIMATELY 75' N. & 100' W. OF HOME PLATE N.W. 8ALLFIELD
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
A. TEST RESULTS COMPLY WITH SPECIFICATIONS ~ffull~'
B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
D.C' MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS RETEST ~[~~t net