CF-Andrew Park 2-LR 940201ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT OF FIELD
COMPACTION TESTS
TESTEOFOR
RODMRN EXCAVATION, INC.
FRISCO, K/M~iSAS
DATE:
02/01/94
PROJECT
ANDREW BROWN JR.
COMMUNITY PARK PHASE
COPPELL, TEXAS
II
OUR REPORT NO.
94001-5
TEST DATA:
DATE; 1OIL ID OPTIMUM MAXIMUM LAB IN PI. ACI IN PLACI
· NOIITUBI OIY OSNIITY MOIITUII lily ililNllTY Pilil CINT COMMirNTe
NUMIII I PCP (lb PCP. COMPACTION
02/01 FG I 12.6 117.3 16.6 111 94 1-BC
02/01 FG I 12.6 117.3 16.4 112 90 1-BC
02/01 FG I 12.6 i17.3 17.0 110 88 1-BC _
02/01 NSG 3 18.2 104.7 22.8 102 97 2-C
TEST LOCATION:
APPROX. 40' N. & 40' E. OF S.W. CORNER OF PAD RESTROOM
APPROX. 42' N. & 42' E. OF S.W. CORNER OF PAD RESTROOM
APPROX. 75' N. & 15' E. OF S.W. CORNIER OF PAD RESTROOM
30' N. OF RESTROOM PAD & 50' S. OF BASEBALL FIELD #1 PARK AREA
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
A. TEST RESULTS COMPLY WITH SPECIFICATIONS
B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
D, RETEST -