Loading...
ST9902-ES100218 Page 1 of 2 Keith Marvin - MEETING SCHEDULE From:   Christina Lawson <kinglp7@hotmail.com> To:   Keith Marvin-City of Coppell engineering <kmarvin@ci.coppell.tx.us> Date:   2/18/2010 11:41 AM Subject:   MEETING SCHEDULE   Hi Keith,   I would like to plan my travel to DFW on the 28th through March 10th.   Would you be so kind as to tell me    A. (feet and square feet), B. Variance process and could we expedite? for easement resolution?   1. A new set back requirement which can only be defeated by a variance for my fencing and FUTURE new home build? How many feet back?  And then total square feet width and length, with additional land square footage that also would not be available to me, and that this would be running the distance of Sandy Lake Rd how many extra square feet is this?   2. Also, with a new set back requirement, is my existing building near that line or is the set back techinically into the physical building or structure?   3. Do I need a "fencing variance" to place the fence which runs along Sandy Lake in the Easement of the new projected setback?   4. Do I also need a "building variance" to place a new home build in the same place as the existing home-if this were so then I have to completely redesign the concept house?   4.a. Would I need a variance to "face" Sandy Lake Road since I will be losing approximately an extra 30' with the new setback?   5. How long to get a variance through the city so we can close on the Easement? or can we close the Easement with some wording or OK on the variance requested?   6. Would I have the possibility to build the fence along Sandy Lake Rd and then wait 24 months to build the remaining fencing and new home build under a variance permit?   7. Could you scan the plat which we drew on and colored....and email to me to print out, so I could talk to you next week prior to travel?  Otherwise, I have a friend which will pick it up from my attorney and take to Kinkos...but will take some time next week....   8. I want to utilize Stuart title company for the closing - Stuart Title of North Texas for the easement....especially since I will be living with the remainder if any mistakes are made.   ______ Please have discussions with your team....same concerns as when I left the meeting.... and the atty does not want me to waste my money with his hourly fee until we know about the above... file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B7D277BCity_...3/16/2010 Page 2 of 2 good advice - he does not milk his clients...thank the Lord... I really am in earnest and do appreciate the fact that this project will 1. stop the Flooding which has affected the foundation on the home and erosion of soil; 2. allow me to fence my property in from people trespass which has occurred for years; 3. understand where I may finally develop the property.... 4. if we need a variance, I need to be  as respectful as possible and file asap.   Thank you again for your patience.... Christina Lawson   Elder, Veterans & Children Housing - Programs  King LP King Realty Group GP LLC King Capital Partners Fl :727-391-1121 Tx:214-632-6708 kinglp7@hotmail.com kinglponline.com   This message (including any attachments) is intended solely for the specific individual(s) or entity (ies) named above, and may contain legally privileged and confidential information. If you are not the intended recipient, please notify the sender immediately by replying to this message and then delete it. Any disclosure, copying, or distribution of this message, or the taking of any action based on it, by other than the intended recipient, is strictly prohibited Your E-mail and More On-the-Go. Get Windows Live Hotmail Free. Sign up now. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B7D277BCity_...3/16/2010