CF-Andrew Park 2-LR 940201 (2)ALPHA TESTING, II~iC.
2209 Wisconsin St., Suite 100
Dallas. Texas 75229
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
RODMAN EXCAVATION, INC.
FRISCO , TEXAS
DATE 02/01/'94
PROJECT
ANDREW BROWN JR.
COMMUNITY PARK PHASE II
COPPELL, TEXAS
OUR REPORT NO. 94001-6
WEATHER: CLEAR
TEMPERATURE RANGE: 22
ALPHA Reptemlltive: a. C.
TO:
45
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE, TO PERFORM FIELD DENSITY TESTING Pd~ID VERIFY
SUBGRADE PREPARATION.
SUBGRADE FOR BALL FIELD AREAS WERE VISUALLY INSPECTED TO ASSUR~ THAT ALL
VEGETATION HAD SEEN PROPERLY REMOVED AND THAT BALL FIELD AREAS HAD BEEN
PREPARED IN ACCORDANCE WITH PROJECT PLANS AND SPECIFICATIONS. ~LL B~LL
FIELD AREAS WERE INSPECTED AND APPEARED TO COMPLY WITH SPECIFICATIONS.
A TOTAL OF SIX FIELD DENSITY TESTS WERE PERFORMED ON NATUR~M_ SUBGRADE SOILS
FOR THE BALL FIELD AREAS. SEE ATTACHED REPORT OF FIELD CONPP~TION TESTS.
CHARLES WAS INFORMED OF TEST RESULTS WHICH APPEARED TO COMPLY WITH PROJECT
SPECIFICATIONS.
TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING
AND INSPECTION.