Loading...
CF-Andrew Park 2-LR 921003ATEC Associates, Inc. 11356 Ma[his Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project N~: Andrel~ Brown Park ATEC Job No.: ~-0Z-92-~928-16 C[iont N~: Tony Cra~ford C~t. Cliont Job No.: General Contractor: To~f CraMford Const. Date: 1013/92 Test No. Hoisture ~ Dry Density Proctor ~ of Proctor Pass Fail Fail Elevation/ Location (PCF) No. Compaction Hoisture Refer F.G. Grid Coordinates Spec Actual or Roadway Station )- 1 65.6 1677 95 60.0 X East inlet back fiLL at finished fill 2 19.5 102.0 1677 95 94.8 X East in[et back fit[ at finished fi[[ 3 19.1 102.3 16Z7 95 95.0 X West inlet back fit[ at finished fiLL (1) Test Location EstabLished by: Grid Lines [] Control Points ~'-]-- Estimation r--] Contractor [] (2) Depth or E[ev. of Test EstabLished by: Survey r"-] Grade StakesL--] Estimation [~] Contractor [] (3) Test Conducted o~: FuLL Time Sasis ~'] Intermittent Sasis [~ ' ) Proctor No. Naximum Density (PCF) Opt. Hoisture (~) Stand. Proctor Nod. Proctor Total Time: 2.5 1677 107.6 ~7.6 ~ ~ ~1 [] ATEC REPRE~NTATIVE Jc~nn Travis Remarks: Respectfutty Subnitted,