Loading...
CF-Andrew Park 2-LR 920930ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project llama: Andreu Oroun Park ATEC Job Ilo.: 25-02-9Z-06928-13 Client Name: Tc~ Cra~ford Censt. Client Job Mo.: Ge~leral Co~tractor: Date:, , , 9/~0/92 Test No. Moisture X Dry Density Proctor X of Proctor Pass Fail Fsi[ Elevation/ Location (PCF) No. Compaction Moisture Refer F.G. Grid Coordinates Spec Actual or Roach~ay Station 1 15.3 99.1 ........ .!,677, 90 92.1 ...... X ...................... -1~,,5', 75' N. of Street VaLve 2 15.6 97.:5 1677' 90 90.& X F.G. 150' S. of Fire Hydrant 90 :5 15.:5 98.7 1677 90 91.7 X F.G. 90' S. of Fire Hydrant 90 (1) Test Location Estsbtished by: Grid Lines [] Controt Points ~-11---I Estimation ~ Contractor ~ (Z) Depth or Etev. of Test Estsbttshed by: Survey [--] Grade Stakes Estimation ~ Contractor (3) Test Conducted on: Futt Time Basis ~ Intermittent Oasis I---I Proctor No. Maximum Oensity (PCF) Opt. Moisture (X) Stand. Proctor Mod. Proctor Totat Time: 2.25 r--I ~ ATEC REPRESENTATIVE John TravJs Remmrks: Respect fu[[y Submitted.