Loading...
CF-Andrew Park 2-LR 9210220CT~22--92 THU 14:55 ATEC ASSOCIATES P. 01 A'l'g~ ASSOCIATE,6, INC. 11356 M~rh~ Average Dall~s, Tex~s 7522~..$157 lZl~ONl~: (7,14) 556-2204 (214) 556-1753 T ! k N $ M I T T A L To~ D~te/Th~e: 0CT--22--92 THU 14:56 ATEC ASSOCIATES P.02 ATEC Associates, Inc. !1356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 COg~iliETE TF~T REPORT Proj,ot: Andrew Brown Park Da~e Sampled; 10/15t92 Client: Tony Crawt'ord Construction Our Report No,: 25-02-92-06928-20 Field Test Data Location or Pour when Smnpled: 100' NORTH OF PARKWAY ST., CENTER OF DRIVEWAY Unit Weight (C-138) Supplier/PhMt TXI #;{1 Sampled By I Delivery Ticket No. 40166 Thne: llntched 7:51 AM Sampled 8:30 AM Truck Number 2:~7 Load Size Temperature: Air. 74°F Concrete, 78"F ~ Mix ID No ..... ~277- Slump: .__~~ in, Air Content. % Waler Added ~m Site (C-143) (C-173/C-231) 10.0 cu. y rl.~. Gals. ~lt, reagth Test Results CYLINDERS A t'en: 28.27 in.: Dat~ Te 10,-22 11-22 Remarks: Ase, J Load, Iba. 87.0G0 PSI 30g0 Avl~ Wid',h, ia. Beam Te#t Data (C-7~) 8p~chl Respectfully submitted, 0CT--22--92 THU 14:56 ATEC ASSOCIATES P.05 ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 MB'FRO 263-1681 Project: Andrew Brown Park Client: Date Sampled: 10/15/92 Tony Crawford Construction Our R~port No.: 25-02-92-0692g-20A Field Test Data location of Pour when Sampled: 250' NORTH OF PARKWAY ST., 10' FROM EAST CURB Unit Weight (C-]38) Sampled By SCOTt I~RRY Time: Butched 9;~I AM Sampled 10;30 AM Temperature: Air 78"F Concrele 7~F Slump: ~ in. Air Content (C-~4~) (C- i 73/C-2~ t) Supplier/Plaat TX!//31 Delivery Ticket No,_ 40.2~2. Truck Nl, lmber~ Load Size__ IO,O _ c,, yds, Mix ID No, 8272 W~tcr Added on Site. 10, Gals. I trength TeSt.rReS_t!]tS (C-39) 'I'YI:~ Speclalet~s: CYLIND~.R$ Area: 2[.~ ~.~ Beam TeaL Dn~ L~ ~ Dn~ Age, Fnilu~ ~t~, Avg Avg ~pa., Special No. ~ri~ Te~ Days I.~d, Iba. PSI Wide. in, Depth. ~, ~c~t'ati~ 1-1201 LAB 1~22 I gg,5(K~ 3170 SP~lFq ED 8'I~F~N GIII 2~ Rem arks: Respectflfily submitted, 0¢T--~2--9~ THU l~ ~s6 ATEC ~$SOCIATES P.04 ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) S$6-2204 METRO 263-1681 COI IETE TEST IlgPORT Project: Andrew Brown Park Date Sampled: 10119/92 Client: Tony Crawford Co,~struction Our Report No.: 25-02-92-06925-23 Field Test l)ata Location of Pour when Sampled: 300' NORTH OF PARKWAY BLVD., WEST HALF OF DRIVEWAY Unit Weight (C-138) Sopplier/PI;mt TXi #31 Sampled By SCOTT I~RRY Delivery Ticket No. 409S6 Time: llutched 7:53 AM Sampled 8:iS AM _ Truck Number_ 23 Load Size. Temperature: Air 62°F Concrete 7#"F Mix ID No. 8272. 3000 PSI Shmlp; ~;.0 in. Air Cooteot % Water Added on Site 10. 10.0 cu. yds. Gat~. Results Type, ,~q~ee imenn= CYLrNDER$ ~b ~Fc D~tc Age. Fnilut~ No, ~fi~ Tcs~cd D~s Lo.d, lbs. ~1 Width. in. Dept. ~. P~puralim in. 1-1271 LA9 1~6 7 6~,~) 2190 t-12~ LAB I I-t~ 1-1273 ~B I I-t0 127~ ~ 11-16 H Remarks: Respectfully submitted, 0CT--22--92 THU 14:57 ATEC ASSOCIATES P.05 ATEC Associates, Inc, 11356 Mathis Avenue Dallag, Texas 75229 (214) 556-2204 METRO 263-1681 TEST REPC --T Project: Andrew Brown Park Date Smnl)lcd: 10/19/92 Ctient: Tony Crawfotd Construction Our Report No.: 25-02-92-0692g-23A Field Test para Location of Pour wheu Sampled: 120' NORTH OF PARKWAY BLVD,, I~ST HALF OF DRIVEWAY Unit Weilht (C-!$8) Supplier/Plant TXI #31 Sampled By SCOTT ~RRY Delivery Ticket No. 41045 ~e: B~ed 10:~ AM ~ampled 10:45 AM Truck Number ~3 ~ad Size Temperature: Air. 71~ _ Concrele_ 7~F Mix 1D No. 8272. 30~ PSi Shmtp: _ $,0 ...... in, Air Content % Water Added on Site. 15,0 10.0 cu..yds. Gals. re gth Test Resu___k . TTP~ 5p¢¢imcna; CYLINOEIRS ^sea'. 25.27 in.a ~am Tenl De~ (C-TS) , , No. ~6,~ Tc~cd Days Lofl0~ lbs, P~l Width, in. Dcp~. ~. Prcpamti~ JR. 1-1275 ~O 1~26 7 ~9,~ 2~0 Remarks: Respectfidly submitted,