CF-Andrew Park 2-LR 921019ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
CONCRETE TEST REPORT
Project: Andrew Brown Park
Date Smnpled: 10/t9/92
Client: Tony Crawtbrd Construction
Our Report No.: 25-02-92-06928-23A
Field Test Data
Location of Pour when Sampled: 120' NORTH OF PARKWAY BLVD., WEST HALF OF DRIVEWAY
Unit Weight (C-138) Supplier/Plant TX1 #31
Sampled By SCOTI' BERRY Delivery Ticket No. 41045
Time: Batched 10:06 AM Sampled 10:45 AM Truck Number 23 Load Size__
Temperature: Air 71°F Concrete 78°F Mix ID No. 8272, 3000 PS[
Slump: 5.0 in. Air Content % Water Added on Site 15.0
(C- ! 43) (C - 173/C-231 )
10.0
cu. yds.
Gals.
Strength Test Results
(C-39~
Type Specimens: CYLINDERS Area: 28.27 ind Beam Tent Dam (C-78}
Lab Type Date Age. Failure Strength. Av~ Avg Span. Special
NO. Curing Tested Days Load, lbs. PS[ Width, in. Depth. in. Preparation
in.
! - 1275 LA B 10-26 7 59,U00 2090
[-1276 LAID 11-16 2~
1-1277 LAB 11-16 28
1-1278 LAB 11-16 14
SPECIFIED STRENGTIi 28 3000
Remarks:
Respectfully submitted,