Loading...
Westhaven 1-LR130612 (2)AmericanRehab &Inspections Office (972) 488 -3042 / Cell (214) 536 -2915 Project Name Westhaven Phase 1 Location Street Date 6/12/2013 Direction Of Survey Upstream City Coppell PO Number Run Number 1.0 Purpose Pre- Acceptance Operator Name Ken Honeycutt Completed Yes Comments Asset ID Line H Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 314.2 Year Laid Year Renewed Sewer Use Sanitary Upstream MH 8 +98 Upstream MH Depth Number Downstream MH 5 +84 Downstream MH Number Depth Media Number Truck Number Contractor Name Cullum Weather Dry Project Name: Date: 6/12/2013 M„ Location: Street Length Surveyed: 313. Run Number: 1.0 Pipe Size: 8" Westhaven Phase 1 Asset ID: Line H Upstream MH Number: 8 +98 8 Downstream MH Number: 5 +84 Direction Of Survey: Upstream Pipe Material: Polyvinyl Chloride ID Number: 5 +84 (3.0) BS - Begin Survey (148.7) Lat 9 - Lateral 9 Oclock (198.2) Lat 9 - Lateral 9 Oclock (248.0) Lat 9 - Lateral 9 Oclock (299.9) Lat 9 - Lateral 9 Oclock (313.8) ES - End Survey Total Distance: 313.8 ID Number: 8 +98 Project Name: Date: 6/1212013 Location: Street Length Surveyed: 183. Run Number: 1.25 Pipe Size: 8" (3.0) BS - Begin Survey (183.3) ES - End Survey Total Distance: 183.3 Westhaven Phase 1 Asset ID: Line H Upstream MH Number: 5 +84 3 Downstream MH Number: 3 +96 Direction Of Survey: Upstream Pipe Material: Polyvinyl Chloride ID Number: 3 +96 ID Number: 5 +84 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line J Location: Street Upstream MH Number: 5 +85 Length Surveyed: 486.5 Downstream MH Number: 1 +00 Run Number: 1.0 Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl p Chloride (3.0) BS - Begin Survey (53.1) Lat 9 - Lateral 9 Oclock (81.6) Lat 3 - Lateral 3 Oclock (87.3) Lat 9 - Lateral 9 Oclock (120.9) Lat 9 - Lateral 9 Oclock (131.5) Lat 3 - Lateral 3 Oclock (157.7) Lat 9 - Lateral 9 Oclock (200.1) Lat 9 - Lateral 9 Oclock (258.8) Lat 9 - Lateral 9 Oclock (266.4) Lat 3 - Lateral 3 Oclock (303.0) Lat 9 - Lateral 9 Oclock (308.2) Lat 3 - Lateral 3 OclocN (344.3) Lat 9 - Lateral 9 Oclocl (351.4) Lat 3 - Lateral 3 Oclock ID Number: 1 +00 (386.0) Lat 9 - Lateral 9 Oclock (398.1) Lat 3 - Lateral 3 Oclock (427.4) Lat 9 - Lateral 9 Oclock (441.8) Lat 3 - Lateral 3 Oclock (476.1) Lat 9 - Lateral 9 Oclock (486.5) ES - End Survey Total Distance: 486.5 ID Number: 5 +85 6 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 296.6 Run Number: .34 Pipe Size: 8" (3.0) BS - Begin Survey (296.6) ES - End Survey Total Distance: 296.6 Westhaven Phase 1 Asset ID: Line H Upstream MH Number: 3 +96 Downstream MH Number: 1 +00 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 3 +96 ID Number: 1 +00 Project Name: Westhaven Phase 1 S Date: 6/12/2013 Asset ID: Line K Location: Street Upstream MH Number: 3 +51 Length Surveyed: 250.6 Downstream MH Number: 1 +00 Run Number: 1.0 Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 1 +00 (3.0) BS - Begin Survey (29.8) Lat 3 - Lateral 3 Oclock (59.4) Lat 9 - Lateral 9 Oclock (70.8) Lat 3 - Lateral 3 Oclock (111.6) Lat 9 - Lateral 9 Oclock (113.9) Lat 3 - Lateral 3 Oclock (153.1) Lat 3 - Lateral 3 Oclock (164.1) Lat 9 - Lateral 9 Oclock (197.1) Lat 3 - Lateral 3 Oclock (246.8) Lat 3 - Lateral 3 Oclock (250.6) ES - End Survey Total Distance: 250.6 IWN ID Number: 3 +51 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line B Location: Street Upstream MH Number: 9 +41 CO Length Surveyed: 72.2 Downstream MH Number: 8 +67 Run Number: 1.0 Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 8 +67 (3.0) BS - Begin Survey (14.4) Lat 3 - Lateral 3 Oclock (49.5) Lat 3 - Lateral 3 Oclock (72.2) ES - End Survey Total Distance: 72.2 IQ ID Number: 9 +41 CO Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 221.4 Run Number: .80 Pipe Size: 8" (3.0) BS - Begin Survey Westhaven Phase 1 (9.9) Lat 9 - Lateral 9 Oclock (46.1) Lat 9 - Lateral 9 Oclock (78.1) Lat 9 - Lateral 9 Oclock (110.5) Lat 9 - Lateral 9 Oclock (144.0) Lat 9 - Lateral 9 Oclock (180.2) Lat 9 - Lateral 9 Oclock (221.4) ES - End Survey Asset ID: Line B Upstream MH Number: 8 +67 Downstream MH Number: 6 +45 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 8 +67 Total Distance: 221.4 (J"-L*N ID Number: 6 +45 Project Name: Westhaven Phase I 8 Date: 6/12/2013 Asset ID: Line E Location: Street Upstream MH Number: 4 +89 Length Surveyed: 394.1 Downstream MH Number: 1 +00 Run Number: .34 Direction Of Survey: Upstream Pipe Material: Polyvinyl Pipe Size: 8 Chloride ID Number: 1 +00 (3.0) BS - Begin Survey (38.2) Lat 9 - Lateral 9 Oclock (87.7) Lat 9 - Lateral 9 Oclock (141.0) Lat 9 - Lateral 9 Oclock (192.7) Lat 9 - Lateral 9 Oclock (242.6) Lat 9 - Lateral 9 Oclock (293.8) Lat 9 - Lateral 9 Oclock (343.8) Lat 9 - Lateral 9 Oclock (394.1) Lat 9 - Lateral 9 Oclock (394.1) ES - End Survey Total Distance: 394.1 fz% ID Number: 4 +89 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 280.5 Run Number: 1.0 Pipe Size: 8" (3.0) BS - Begin Survey Westhaven Phase 1 (15.3) Lat 9 - Lateral 9 Oclock (49.2) Lat 9 - Lateral 9 Oclock (87.1) Lat 9 - Lateral 9 Oclock (123.2) Lat 9 - Lateral 9 Oclock (158.6) Lat 9 - Lateral 9 Oclock (199.5) Lat 9 - Lateral 9 Oclock (280.5) ES - End Survey Asset ID: Line B Upstream MH Number: 6 +45 Downstream MH Number: 3 +68 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 6 +45 Total Distance: 280.5 (J-Lv) ID Number: 3 +68 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 275.2 Run Number: .34 Pipe Size: 8" (3.0) BS - Begin Survey Westhaven Phase 1 (75.8) Lat 9 - Lateral 9 Oclock (114.0) Lat 9 - Lateral 9 Oclock (146.8) Lat 9 - Lateral 9 Oclock (181.8) Lat 9 - Lateral 9 Oclock (217.3) Lat 9 - Lateral 9 Oclock (250.5) Lat 9 - Lateral 9 Oclock (275.2) ES - End Survey Asset ID: Line B Upstream MH Number: 3 +68 Downstream MH Number: 1 +00 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 3 +68 Total Distance: 275.2 /1N ID Number: 1 +00 C. Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 127.1 Run Number: .34 Pipe Size: 8" (3.0) BS - Begin Survey Westhaven Phase 1 (17.1) Lat 3 - Lateral 3 Oclock (32.5) Lat 9 - Lateral 9 Oclock (73.1) Lat 3 - Lateral 3 Oclock (84.4) Lat 9 - Lateral 9 Oclock (127.1) ES - End Survey Asset ID: Line F Upstream MH Number: 5 +75 Downstream MH Number: 7 +05 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 5 +75 Total Distance: 127.1 (X--*l ID Number: 7 +05 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 485.2 Run Number: .34 Pipe Size: 8" (3.0) BS - Begin Survey Westhaven Phase 1 (29.3) Lat 3 - Lateral 3 Oclock (52.2) Lat 9 - Lateral 9 Oclock (81.0) Lat 3 - Lateral 3 Oclock (99.6) Lat 9 - Lateral 9 Oclock (131.6) Lat 3 - Lateral 3 Oclock (154.4) Lat 9 - Lateral 9 Oclock (183.4) Lat 3 - Lateral 3 Oclock (208.6) Lat 9 - Lateral 9 Oclock (236.1) Lat 3 - Lateral 3 Oclock (286.2) Lat 3 - Lateral 3 Oclock (337.2) Lat 3 - Lateral 3 Oclock (391.7) Lat 3 - Lateral 3 Oclock Asset ID: Line F Upstream MH Number: 5 +75 Downstream MH Number: 1 +00 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 5 +75 Q, (437.1) Lat 3 - Lateral 3 Oclock Z 13 (485.2) ES - End Survey Total Distance: 485.2 ID Number: 1 +00 Project Name: Westhaven Phase 1 j Date: 6/12/2013 Asset ID: Line C Upstream MH Number: Location: Street 6 +64 CO Downstream MH Number: Length Surveyed: 124.1 5 +40 Direction Of Survey: Run Number: .34 Upstream Pipe Material: Polyvinyl Pipe Size: 8" Chloride ID Number: 5 +40 (3.0) BS - Begin Survey (23.0) Lat 9 - Lateral 9 Oclock (72.5) Lat 9 - Lateral 9 Oclock (121.3) Lat 9 - Lateral 9 Oclock (124.1) ES - End Survey Total Distance: 124.1 4�& ID Number: 6 +64 CO Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line C Location: Street Upstream MH Number: 5 +40 Length Surveyed: 159.4 Downstream MH Number: 3 +80 Run Number: .34 Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 5 +40 (3.0) BS - Begin Survey (19.1) Lat 3 - Lateral 3 Oclock (68.4) Lat 3 - Lateral 3 Oclock (120.0) Lat 3 - Lateral 3 Oclock (159.4) ES - End Survey Total Distance: 159.4 rj-L*I% ID Number: 3 +80 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line G Location: Street Upstream MH Number: 3 +95 Length Surveyed: 295.9 Downstream MH Number: 1 +00 Run Number: 1.0 Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 3 +95 (3.0) BS - Begin Survey (24.9) Lat 9 - Lateral 9 Oclock (34.2) Lat 3 - Lateral 3 Oclock (76.5) Lat 9 - Lateral 9 Oclock (86.1) Lat 3 - Lateral 3 Oclock (128.3) Lat 9 - Lateral 9 Oclock (137.0) Lat 3 - Lateral 3 Oclock (178.4) Lat 9 - Lateral 9 Oclock (189.3) Lat 3 - Lateral 3 Oclock (232.9) Lat 9 - Lateral 9 Oclock (239.8) Lat 3 - Lateral 3 Oclock (295.9) ES - End Survey Total Distance: 295.9 51LN ID Number: 1 +00 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 347.2 Run Number: .34 Pipe Size: 8" (3.0) BS - Begin Survey Westhaven Phase 1 (28.5) Lat 9 - Lateral 9 Oclock (50.1) Lat 3 - Lateral 3 Oclock (77.3) Lat 9 - Lateral 9 Oclock (121.0) Lat 3 - Lateral 3 Oclock (130.7) Lat 9 - Lateral 9 Oclock (190.7) Lat 3 - Lateral 3 Oclock (254.4) Lat 3 - Lateral 3 Oclock (347.2) ES - End Survey Asset ID: Line D Upstream MH Number: 4 +54 Downstream MH Number: 1 +00 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 4 +54 Total Distance: 347.2 tyN ID Number: 1 +00 /(IP Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line C Upstream MH Number: Location: Street 3 +80 Length Surveyed: 280.3 Downstream MH Number: 1 +00 Run Number: Direction Of Survey: .34 Upstream Pipe Material: Polyvinyl Pipe Size: 8" Chloride ID Number: 1 +00 (3.6) BS - Begin Survey (280.3) ES - End Survey Total Distance: 280.3 ID Number: 3 +80 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 175.4 Run Number: .25 Pipe Size: 10" (3.0) BS - Begin Survey Westhaven Phase 1 (20.4) Lat 9 - Lateral 9 Oclock (57.5) Lat 3 - Lateral 3 Oclock (68.4) Lat 9 - Lateral 9 Oclock (117.0) Lat 9 - Lateral 9 Oclock (144.1) Lat 3 - Lateral 3 Oclock (175.4) ES - End Survey Asset ID: Line A Upstream MH Number: 36 +74 CO Downstream MH Number: 34 +99 Direction Of Survey: Upstream Pipe Material: Polyvinyl Chloride ID Number: 34 +99 Total Distance: 175.4 � ID Number: 36 +74 CO /t Project Name: Westhaven Phase 1 P� Date: 6/12/2013 Asset ID: Line A Location: Street Upstream MH Number: 34 +99 Length Surveyed: 355.6 Downstream MH Number: 31 +44 Run Number: .25 Direction Of Survey: Downstream Pipe Size: 10" Pipe Material: Polyvinyl Chloride (3.0) BS - Begin Survey (12.4) Lat 9 - Lateral 9 Oclock (18.1) Lat 3 - Lateral 3 Oclock (69.8) Lat 3 - Lateral 3 Oclock (76.3) Lat 9 - Lateral 9 Oclock (120.9) Lat 3 - Lateral 3 Oclock (135.4) Lat 9 - Lateral 9 Oclock (171.5) Lat 3 - Lateral 3 Oclock (195.4) Lat 9 - Lateral 9 Oclock (223.0) Lat 3 - Lateral 3 Oclock (255.4) Lat 9 - Lateral 9 Oclock (272.8) Lat 3 - Lateral 3 Oclock (312.6) Lat 9 - Lateral 9 Oclock ID Number: 34 +99 (322.9) Lat 3 - Lateral 3 Oclock (355.6) ES - End Survey Total Distance: 355.6 ID Number: 31 +44 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line A Location: Street Length Surveyed: 306.2 Run Number: .25 Pipe Size: 10" (3.0) BS - Begin Survey (96.3) Lat 3 - Lateral 3 Oclock (220.2) Lat 3 - Lateral 3 Oclock (306.2) ES - End Survey Upstream MH Number: 31 +44 Downstream MH Number: 28 +38 Direction Of Survey: Upstream Pipe Material: Polyvinyl Chloride ID Number: 28 +38 Total Distance: 306.2 tx� ID Number: 31 +44 a Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 230.1 Run Number: .25 Pipe Size: 10" (3.0) BS - Begin Survey Westhaven Phase 1 (9.0) Lat 9 - Lateral 9 Oclock (108.6) Lat 9 - Lateral 9 Oclock (198.8) Lat 3 - Lateral 3 Oclock (230.1) ES - End Survey Asset ID: Line A Upstream MH Number: 28 +38 Downstream MH Number: 26 +09 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 28 +38 Total Distance: 230.1 /1N ID Number: 26 +09 7.1 (364.7) Lat 9 - Lateral 9 Oclock (377.6) Lat 3 - Lateral 3 Oclock (428.7) Lat 3 - Lateral 3 Oclock (433.1) Lat 9 - Lateral 9 Oclock (480.2) Lat 3 - Lateral 3 Oclock (506.0) ES - End Survey Total Distance: 506 ID Number: 21 +13 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line A Location: Street Upstream MH Number: 26 +09 Length Surveyed: 506 Downstream MH Number: 21 +13 Run Number: .25 Direction Of Survey: Downstream Pipe Size: 10" Pipe Material: Polyvinyl Chloride ID Number: 26 +09 (3.0) BS - Begin Survey (12.2) Lat 3 - Lateral 3 Oclock (52.9) Lat 9 - Lateral 9 Oclock (63.9) Lat 3 - Lateral 3 Oclock (104.5) Lat 9 - Lateral 9 Oclock (117.2) Lat 3 - Lateral 3 Oclock (154.1) Lat 9 - Lateral 9 Oclock (169.0) Lat 3 - Lateral 3 Oclock (206.7) Lat 9 - Lateral 9 Oclock (220.3) Lat 3 - Lateral 3 Oclock (259.7) Lat 9 - Lateral 9 Oclock (272.9) Lat 3 - Lateral 3 Oclock (310.4) Lat 9 - Lateral 9 Oclock (326.2) Lat 3 - Lateral 3 Oclock A4 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 182.7 Run Number: .20 Pipe Size: 12" (3.0) BS - Begin Survey Westhaven Phase 1 (141.0) Lat 3 - Lateral 3 Oclock (182.7) Lat 3 - Lateral 3 Oclock Total Distance: 182.7 Asset ID: Line A Upstream MH Number: 21 +13 Downstream MH Number: 19 +16 Direction Of Survey: Upstream Pipe Material: Polyvinyl Chloride ID Number: 19 +16 ID Number: 21 +13 P5 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line A Upstream MH Number: Location: Street 19 +16 Downstream MH Number: Length Surveyed: 172.4 17 +41 Direction Of Survey: Run Number: .20 Downstream Pipe Material: Polyvinyl Pipe Size: 12" Chloride ID Number: 19 +16 (3.0) BS - Begin Survey (85.1) Lat 9 - Lateral 9 Oclock (124.3) Lat 9 - Lateral 9 Oclock (165.3) Lat 9 - Lateral 9 Oclock (172.4) ES - End Survey Total Distance: 172.4 rJEN ID Number: 17 +41 Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 217.1 Run Number: .20 Pipe Size: 12" (3.1) BS - Begin Survey Westhaven Phase 1 (27.5) Lat 3 - Lateral 3 Oclock (77.8) Lat 3 - Lateral 3 Oclock (195.9) Lat 3 - Lateral 3 Oclock (217.1) ES - End Survey Asset ID: Line A Upstream MH Number: 17 +41 Downstream MH Number: 15 +19 Direction Of Survey: Upstream Pipe Material: Polyvinyl Chloride ID Number: 15 +19 Total Distance: 217.1 4ZN ID Number: 17 +41 -25 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line A Location: Street Upstream MH Number: 15 +19 Length Surveyed: 495 Downstream MH Number: 10 +19 Run Number: .20 Direction Of Survey: Upstream Pipe Size: 12" Pipe Material: Polyvinyl Chloride (3.0) BS - Begin Survey (7.1) Lat 9 - Lateral 9 Oclock (29.6) Lat 3 - Lateral 3 Oclock (54.4) Lat 9 - Lateral 9 Oclock (80.9) Lat 3 - Lateral 3 Oclock (102.8) Lat 9 - Lateral 9 Oclock (130.6) Lat 3 - Lateral 3 Oclock (154.1) Lat 9 - Lateral 9 Oclock (180.7) Lat 3 - Lateral 3 Oclock (204.5) Lat 9 - Lateral 9 Oclock (230.3) Lat 3 - Lateral 3 Oclock (253.5) Lat 9 - Lateral 9 Oclock (280.7) Lat 3 - Lateral 3 Oclock (335.6) Lat 3 - Lateral 3 Oclock ID Number: 10 +19 (407.8) Lat 3 - Lateral 3 Oclock (495.0) ES - End Survey Total Distance: 495 ID Number: 15 +19 aC3 Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line A Location: Street Upstream MH Number: 10 +19 Length Surveyed: 495.5 Downstream MH Number: 5 +19 Run Number: .20 Direction Of Survey: Downstream Pipe Size: 12" Pipe Material: Polyvinyl Chloride (3.0) BS - Begin Survey (10.3) Lat 9 - Lateral 9 Oclock (34.6) Lat 3 - Lateral 3 Oclock (59.6) Lat 9 - Lateral 9 Oclock (84.5) Lat 3 - Lateral 3 Oclock (110.0) Lat 9 - Lateral 9 Oclock (136.4) Lat 3 - Lateral 3 Oclock (162.8) Lat 9 - Lateral 9 Oclock (186.0) Lat 3 - Lateral 3 Oclock (210.7) Lat 9 - Lateral 9 Oclock (236.6) Lat 3 - Lateral 3 Oclock (256.4) Lat 9 - Lateral 9 Oclock (285.0) Lat 3 - Lateral 3 Oclock (309.7) Lat 9 - Lateral 9 Oclock (337.2) Lat 3 - Lateral 3 Oclock ID Number: 10 +19 (358.6) Lat 9 - Lateral 9 Oclock (386.2) Lat 3 - Lateral 3 Oclock (404.7) Lat 9 - Lateral 9 Oclock (437.5) Lat 3 - Lateral 3 Oclock (495.5) ES - End Survey Total Distance: 495.5 ID Number: 5 +19 ID Number: 3 +18 (3.0) BS - Begin Survey (154.3) ES - End Survey Total Distance: 154.3 � ID Number: 4 +88 EP Project Name: Westhaven Phase 1 Date: 6/12/2013 Asset ID: Line L Upstream MH Number: Location: Street 4 +88 EP Length Surveyed: 154.3 Downstream MH Number: 3 +18 Run Number: .34 Direction Of Survey: Upstream Pipe Material: Polyvinyl Pipe Size: 8" Chloride ID Number: 3 +18 (3.0) BS - Begin Survey (154.3) ES - End Survey Total Distance: 154.3 � ID Number: 4 +88 EP Project Name: Date: 6/12/2013 Location: Street Length Surveyed: 220.9 Run Number: .34 Pipe Size: 8" (3.0) BS - Begin Survey (220.9) ES - End Survey Westhaven Phase 1 Asset ID: Line L Upstream MH Number: 3 +18 Downstream MH Number: 1 +00 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride ID Number: 3 +18 Total Distance: 220.9 /TN ID Number: 1 +00 C2,9