Coppell Ind 2-LR130606 (2)
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 465
3090 Olive Street, Suite 300
REPORT DATE:
06-06-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
05-13-13
TECHNICIAN:
J. Bowers
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Paving 500-140’S, 0-90’W from NW building corner.
Items Observed:
Sheet C2.02
Reference Plans or Notes Used:
There were no deviations noted.
x
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-MailSubmitted by:
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/mg
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 462
3090 Olive Street, Suite 300
REPORT DATE:
06-06-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
05-09-13
TECHNICIAN:
C. Winchester
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Paving: 86-320’S, 8-100’E from NE building corner.
Items Observed:
Sheet C2.2
Reference Plans or Notes Used:
There were no deviations noted.
x
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-MailSubmitted by:
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/mg
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 456
3090 Olive Street, Suite 300
REPORT DATE:
06-06-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
05-03-13
TECHNICIAN:
J. Lambert
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Paving: 750-1125’S, 5-120’E from NW building corner.
Items Observed:
Sheet C2.01
Reference Plans or Notes Used:
There were no deviations noted.
x
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-MailSubmitted by:
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/mg
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX