Loading...
Burch Lot 4-CS 950518 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: BURCH ADDITION, LOT 4, BLOCK A, (ORTHODONTICS CLINIC) FINAL PLAT P & Z HEARING DATE: May 18, 1995 C.C. HEARING DATE: June 13, 1995 LOCATION: West side of Denton Tap, approx. 535 feet south of Bethel School Rd. SIZE OF AREA: 1.251 acres CURRENT ZONING: C (Commercial) REQUEST: Approval of a final plat APPLICANT: Frank J. Stich III, DDS, MSD Michael Dowdey (Owner) Dowdey, Anderson & Associates, Inc. 580 S. Denton Tap Rd.,//220 (Engineer) Coppell, TX 75019 16250 Dallas Parkway, #100 (214) 462-7892 Dallas, TX 75248 (214) 931-0694 HISTORY: The Planning and Zoning Commission approved a preliminary plat for Burch Addition on July 21, 1994, with 8 conditions. On August 9, 1994, the City Council approved the preliminary plat with 4 conditions: 1) execution of a property owner's agreement to maintain landscaping, 2) provision of a utility layout, 3) construction of left-mm lane and driveway across common access easement prior to a Certificate of Occupancy on either Lot 1, 3 or 4, 4) establishment of a development line on the west side of the utility easement for the proposed sewer line. TRANSPORTATION: Denton Tap Road is a P6D, six-lane divided thoroughfare built to standard in a 1130 foot r.o.w. Item 11 SURROUNDING LAND USE & ZONING: North - commercial; C South - vacant; C East commercial; C West- single-family; SF-12 COMPREHENSIVE PLAN: The 1987 Plan showed retail. DISCUSSION: The use of a light blond to rust 'layered' flagstone or sandstone on the proposed building and monument sign is compatible with certain other features in the vicinity, such as the entrance monument at Creek View, the planter around the sign at Denton Tap Office Plaza, and the planters and retaining walls at the offices on each side of Meadowcreek Drive. The Subdivision Ordinance provides that, where conditions do not warrant underground utilities, the use of overhead wiring may be considered if the services are on the rear property line. Texas Utilities needs to serve the property from overhead lines located on the east side of Denton Tap Road. They have agreed to place a pole 100 feet west of the front property line, extend an overhead line across Denton Tap Road to that pole, and thereby eliminate the need for any additional poles along the road. At the time of preliminary plat approval, Wes Burch agreed to provide a 20'-wide hike-and-bike trail easement. On Lots 2 and 3 it adjoins the west side of a 20'-wide sanitary sewer easement which parallels the creek. Dr. Stich does not want the trail to parallel the creek on his property. He proposes that it follow his north property line to the street and parallel the street southward from that point. The siting of the proposed building has taken into careful consideration the location of numerous trees worthy of preservation. To locate the trail alongside the creek, without changing the proposed building location, requires that a 48'-long section of the trail cross the flood plain via a foot bridge. The placement of the trail between the building and the creek does not interfere with the view of the creek from the building. Placement of the building between the trail and the creek denies the public a view of the creek. RECOMMENDATIONS: Staff recommends approval of the Final Plat with the following three conditions: 1. Provision of an easement for overhead electric utilities, as described previously, and subject to City Council approval of a variance of the requirements of Appendix C Section 5 of the Subdivision Ordinance. Item 11 2. Placement of the 20'-wide hike-and-bike trail easement alongside the flood plain, with an approximately 50'-long segment partially within the flood plain. 3. Revision of the site plan and landscape plan to show sewer easement on the north side of the lot as a 20'-wide easement, on-site utility locations, fire hydrant easement and 15'- wide utility easement as recommended by the Engineering Department. ALTERNATIVES: 1) Approve the final plat 2) Disapprove the final plat 3) Modify the final plat ATTACHMENTS: 1) Final Plat 2) Site Plan 3) Landscape Plan 4) Irrigation Plan 5) A letter from the applicant 6) Engineering Comments Item 11 DEVELOPMENT REVIEW COMMITTEE!. - ':: ENGINEERING COMMENTS ~e~~ ITEM: The Burch Addition, Lot 4, Block A, Final Plat, to allow de an ortlunto~s clinic on property located at the west side of Denton Tap Road, approximately 535 feet south of Bethel School Road, at the request of Dowdey, Anderson and Associates. DRC DATE: April 27, 1995 and May 4, 1995 CONTACT: Ken Griffin, P.E., Assistant CRy Manager/Ci~ Engineer (304-3679) Site Plan & Landscape Plan Comments: 1. On the landscape plans, the sewer easement on the north side of the lot should be correctly shown as 20 feet. 2. Show on-site utility locations. 3. Show easement for fire hydrant. 4. On site plan, show 15' utility easement (comment made in the 5/4/95 landscape plan review letter). Developer Information Comment: 1. It appears as though the location of the irrigation system and the landscaping is going to be in conflict with the sanitary sewer to be constructed late this year. There needs to be some discussion between the applicant and the City as to the possibility of delaying the installation of the irrigation and landscaping until such time as the sewer line has been installed without delaying the approval of a CO, if in fact the facility is constructed prior to the installation of the sanitary sewer line.