Loading...
2013_07_09 T H E • C 1 T Y • O F COPPELL rp rn- 00 A 8 June 14, 2013 RE: UTILITY COORDINATION MEETING A meeting has been scheduled for July 9, 2013 at 2:00 p.m. to discuss upcoming municipal construction projects within the City of Coppell. The City is particularly interested in discussing the following projects scheduled to start construction in mid to late 2013 and continue into 2014: Project Est. Construction Number Description/Location Start Date ST 05-02 A Freeport Parkway (from Ruby Rd to Sandy Lake Rd) ST 05-02 B Freeport Parkway(from Sandy Lake Rd to SH 121) ST 03-01 C Bethel Road (from Park Rd to Mitchell St) and Coppell Road(from Bethel Rd to Cooper Ln) Sales Tax Residential reconstruction of streets including: 2010—2012 Shadowcrest, Sandy Knoll, Southern Belle, Projects Highland Meadow, Edgewood, Chartwell and Whispering Hills Drive The design engineers for several of the projects will be in attendance. The meeting will be held in the Main Conference Room located at 265 Parkway Boulevard. You or a representative from your company is encouraged to attend. If you have any questions,please contact me at 972-304-3681. Sincerely, Keith R. Marvin, P.E. Project Engineer Office: 972-304-3681 kmarvin@coppelltx.gov 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 To: jim2133 @att.com vTo: mikehcook @hotmail.com To: mike.rassmussen @twcable.com To: rick.fielding @oncor.com _'`To: Iori.dunham @twcable.com To: bill.bland @360.net To: david.cheney @twcable.com To: dmckelvain @brazoselectric.com To: richard.hildebrand @oncor.com / To: gary.woolsey @atmosenergy.com To: michael.wisniewski @tritextech.com To: gward @coserv.com To: paul.bowles @verizon.com To: mattern @att.com /To: richard.brewster @oncor.com To: john.hollingsworth.jr @ att.com To: pnwakoby @expl.com To: pbridges @coserv.com To: richard.johnson @atmosenergy.com To: 9lenn• nnt_kee@ or\ Ccsyr. -To �Aul.111.141eSSen he(mme( c One•Je('i7-on.c671& TO ' e came.eo v to re-zsan •Sccamar► C aVeeiZon �� T N E • C 1 T Y • O F COPPELL A S' 9 CIP Utility Meeting July 9, 2013 @ 2:00 p.m. I. City Contacts Keith Marvin,P.E., Project Engineer(972-304-3681)-Plans,construction schedules,utility meetings George Marshall, P.E. —Traffic Engineer (972-304-3562)—Traffic,city fiber,project management Michael Garza,P.E.—Civil Engineer (972-304-7019)—Project management,permits, plan review Scott Latta—Engineering Technician(972-304-3683)—As-builts Albert Samaniego—Construction Inspector (469-576-1458) Larry Davis—Construction Inspector (972-304-3684) Rick O'Dell—Construction Inspector (469-576-7709) Engineering Fax No.—972-304-3570 Streets Telephone No.—972-462-5150 Water Utilities Telephone No.—972-462-5155 II. Permits A. Need to identify on permit how the utility has been abandoned: • 1. Abandoned in place or 2. Abandoned by removal. This will help the contractor and the inspector during construction. Inspector has seen places where the conduit is left in place and the new facilities are installed below in a different colored conduit. B. Need to submit a Right-of-Way Use permit prior to commencing and a Completion Verification Notice when the relocations are complete. III. Access to the latest plans The latest plans for the following projects will be available on our FTP site through August 1, 2013. If you don't see the plans you're looking for, please contact the City contact for the project. You can access the City of Coppell FTP site by using the following link: ftp://ftpl.ci.coppell.tx.us/eng Anonymous access is currently allowed,thus no password is required. The plans you need are located in a folder named for the street. 1 IV. Sandy Lake Road ST 99-02 (Coppell Road North to Denton Tap) This project is under construction. All utility relocations should be complete,or nearing completion. Design Engineer— Teague Nall and Perkins Casey McBroom,P.E. —214-461-9867 City Contact—Keith Marvin V. '/Cent Sales Tax 2012 Mockingbird Lane This project involves reconstruction of residential streets within the same footprint of the existing street. No additional ROW is needed. This project is under construction. Construction is anticipated to be complete by September. Design Engineer— J Volk Consulting,Inc. Matt Atkins, P.E. —972-201-3102 City Contact—Keith Marvin VI. Creekview Drive DR 12-01 This project involves bank stabilization and reconstruction of Creekview Drive between Royal Lane and Freeport Parkway. This project is under construction. Construction is anticipated to be complete by late October. Design Engineer— Walter P. Moore Ernest Fields,P.E. —214-740-6200 City Contact—George Marshall VII. Bethel Road II ST03-01B (MitchelUS. Coppell to Penfolds Drive and Coppell Road from Bethel to Cooper Lane) This project represents the remaining portion of Bethel Road and Coppell Road. The plans currently stand at 90%. This project will be bid once all utility relocations have taken place.. Construction is anticipated to begin late this year. The City is currently installing some fiber optic communication duct within the project limits. Design Engineer— Freese&Nichols,Inc. Caleb Thornhill,P.E. —214-217-2282 City Contact—Keith Marvin 2 VIII. Freeport Parkway ST 05-02A(Ruby Road to Sandy Lake) Right of Way acquisition is nearly complete on this project. One parcel remains to be acquired, and the city has an agenda item on tonight's City Council meeting to proceed with condemnation.. The plans stand at 90%,and will be made available via FTP. Construction is anticipated to begin this year. Design Engineer— Teague Nall and Perkins Chris Schmitt,P.E. —214-461-9867 City Contact—Michael Garza IX. Freeport Parkway ST 05-02B(Sandy Lake to SH121) This project will consist of building a new stretch of Freeport Parkway between Sandy Lake Road and SH121. Intersections exist at both connection points,and the road will connect those two points. Negotiations are under way with the land owner for access rights and acquisition. Design Engineer— Teague Nall and Perkins Chris Schmitt, P.E. —214-461-9867 City Contact—Michael Garza X. 'A Cent Sales Tax 2012 Southern Belle This project involves reconstruction of residential streets within the same footprint of the existing street. No additional ROW is needed. This project is in the final design stages, and will be advertised for bid in August,with construction beginning this fall. Design Engineer— Verdunity, Inc. Kristin Green,P.E. —214-729-8733 City Contact—Michael Garza XI. '/a Cent Sales Tax 2011 Sandy Lake Road Pavement Repair(Denton Tap to Kimbel Kourt) This project involves extensive repairs to Sandy Lake Road between Denton Tap and Kimbel Kourt east of MacArthur. This project is in the final design stages,and will be advertised for bid in August, with construction beginning this fall. No pavement widening will take place, and no movement of utilities is anticipated. Design Engineer— In House Keith Marvin,P.E. XII. 'A Cent Sales Tax 2010/2011 Shadowcrest Drive Sandy Knoll 3 This project involves reconstruction of residential streets within the same footprint of the existing street. No additional ROW is needed. Design is progressing. There may be relocation of street light poles or other surface features required. Construction will begin on these projects this fall. Design Engineer— JQ Infrastructure(Sandy Knoll) In House(Shadowcrest) Louis Hund, P.E. —972-392-7340 George Marshall,P.E. City Contact—Keith Marvin XIII. Upcoming projects These upcoming reconstruction projects are in the preliminary planning and design stages. Plans are not yet available. Whispering Hills(Sandy Lake to Magnolia) Highland Meadow Circle(All) Edgewood Drive(Heather Glenn to Breawood) Plantation Drive(Bethel School to Coppell Road) Chartwell Drive(Beltline to City Limit) Sandy Lake Road Hil&Bike Trail(Freeport to Royal) Reconstruction of the intersection of MacArthur Blvd. and Beltline Road , p,, / dti 4 T H E • C I T Y • O F COPPELL A s' t CITY OF COPPELL UTILITY COORDINATION MEETING JULY 9,2013 NAME COMPANY TELEPHONE NO. EMAIL/FAX 1. � R oV. .(Ztii K1/1 el(C T) i'•!)7! 2P! ' V/2-2 Z 8 Jo pi) LOf,f 0.4 ON, r'e4{( f� is c4' 2. 5 di; //itgAtft49 /4" i 411- s sfl(,0./gig h ia)( lNikW/ -7'rc j 3. ` vee'-zci, y0- 69/ s°°�7�1;z �» `� �(.t-44 4. , 0 ,?-� c4 t'- /<.- - .J ., 2 c)s, r-\ - 'y `'r[ ! .e...(/-1, cc�-„ 5. G l [ g/c-40/ 9 23Pewsri=72-- 214 *4 1z'S gl aez). b,ee tee Gateg.. co M 6. ch-m e 614'/$.‘ 1- c I/ Gi�'tar IL bl e. g,q 849 103E ein;i1;e. cW�K @ tw�klol c c e,y- 7. el c.-)r`ztra o1.hscrv, Ai mos E-1N 0.3r5y 01.,I4-G,3 - 13a4 r,ch 8. J 9. CC1X /114-14.4•\ Cer,edi 172 - 3 ', 2CY l 4r14),,,e ryfill o'X SG 10.