Loading...
Westhaven 1-LR130612 American Rehab & Inspections, INC. F (214) 536-2915 ��' �� LOW PRESSURE AIR ''EST FOR GRAVITY SANIT' ' SE �f-2915 Z Test Procedures : Each section of sewer shall be tested between suc_ceessive may n'l s. u�TEST DIVI$�QN Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reach,,.4At that time the flow •=., shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi gau_- f•r at least two(2) ti,tes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. Pres ' zip the pi.• AK, e constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air 4.6 ' ei, , ressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found,the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table,the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table,the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Size Linear Feet Time Passed Passed A 36+74-34+99 10" 175 11:52 Yes Yes A 34+99-31+44 10" 355 11:52 Yes Yes A 31+44-28+38 10" 306 11:52 Yes Yes A 28+38-26+09 10" 230 11:52 Yes Yes A 26+09-21+13 10" 500 11:52 Yes Yes A 21+13-19+16 12" 190 14:15 Yes Yes A 19+16-17+41 12" 172 14:15 Yes Yes A 17+41-15+19 12" 217 14:15 Yes Yes A 15+19-10+19 12" 495 14:15 Yes Yes A 10+19-5+19 12" 496 14:15 Yes Yes B 9+41-8+67 8" 72 8:52 Yes Yes B 8+67-6+45 8" 221 8:52 Yes Yes B 6+45-3+68 8" 281 8:52 Yes Yes B 3+68-1+00 8" 275 8:52 Yes Yes Contractor: Cullum Date: 6+12-13 Project: Westhaven Ph Job#: Location: 0'Tested By: Oscar l/ Inspector: Larry Davi City Of: Coppell CI ie 07) American Rehab & Inspections, INC. (214) 536-2915 , Q� LOW PRESSURE AIR TEST FOR GRAVITY SANIT,'�'Y '. FE29 15 Test Procedures : Each section of sewer shall be tested between successive marsh. ESTING DIVISION " ' Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been rea Ud. At that time the fl. .`f air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi ue for at least two(' ' • utes to a l l o w t h e air t e m p e r a t u r e to come to equilibrium with the t e m p e r a t u r e of t h e pipe walls. - • ,i in t h e ; -,s. 1 be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce . . .,J ■ e. Pressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found,the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table,the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table,the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Size Linear Feet Time Passed Passed C 6+64-5+40 8" 124 8:52 Yes Yes C 5+40-3+80 8" 159 8:52 Yes Yes C 3+80-1+00 8" 280 8:52 Yes Yes D 4+54-1+00 8" 347 8:52 Yes Yes E 4+89-1+00 8" 394 8:52 Yes Yes F 7+05-5+75 8" 127 8:52 Yes Yes F 5+75-1+00 8" 480 8:52 Yes Yes G 3+95-1+00 8" 296 8:52 Yes Yes H 8+98-5+84 8" 314 8:52 Yes Yes H 5+84-3+96 8" 183 8:52 Yes Yes H 3+96-1+00 8" 296 8:52 Yes Yes J 5+85-1+00 8" 486 8:52 Yes Yes K 3+51-1+00 8" 251 8:52 Yes Yes L 4+88-3+18 8" 155 8:52 Yes Plug L 3+18-1+00 8" 220 8:52 Yes Yes Contractor: Cullum Date: 6+12-13 Project: Westhaven Ph.1 Job#: Location: Tested By: Oscar Inspector: Larry Davis City Of: Coppell