Loading...
Burger King 2-CS000127 (3) DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell Burger King No. 2, Lot 1, Block 1, Preliminary Plat, to allow the development of a fast food restaurant on approximately 0.92 acres of property located along the west side of N. Denton Tap Road, approximately 135 feet south of the S.H. 121 Bypass at the request of Rekha Engineering, Inc. DRC DA TE: January 27, 2000 and February 3, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STA TUS: ,"'PRELIMINARY 1. The proposed sanitary sewer system needs to be connected to the system provided to the north and west of the proposed development. 2. The proposed relocation of existing irrigation water meters must be coordinated with the Leisure Services Department. 3. A 10' right-of-way dedication needs to be provided along Denton Tap. 4. Remove topographic and utility information from the preliminary plat.