CF-Andrew Park 2-LR 921019 (5)ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
CONCRETE ,TEST,,.REPORT
Project: Andrew Brown Park
Date Sampled: 10/19/92
Client: Tony Crawford Construction
Our Report No.: 25-02-92-06928-23
Field Test Data
Location of Pour when Sampled: 300' NORTH OF PARKWAY BLVD., WEST HALF OF DRIVEWAY
Unit Weight (C-138) Supplier/Plant TXi #31
Sampled By SCOTY BERRY Delivery Ticket No. 40956
Time: Batched 7:53 AM Sampled 8:15 AM Truck Number 23 Load Size 10.0
Temperature: Air 62°F . Concrete 78°F Mix ID No. 8272, 3000 psi
Slump: 5.0 in. Air Content % Waler Added on Site 10, .
(C-143) (C-173/C-231)
cu. yds.
Gals.
Strentth Test Results
(C-39)
Typ* Specimens: CYLINDERS Area: 28.27 in2 l~am Test Dam (C-78)
Lab Type Da~ Age. Failure Su'~ng~h. Avg Avg Span. Sp~:ial
No. Curing Teated Days Load, lbs. PSI Widlh. in. L~pth. in. Preparatio~
in.
1-1271 LAB 10-26 7 62.000 2190
1-1272 [.All l 1-16 28
1-1273 LAB 11-16 28
1274 LAB 11-16 H
SPECIFIED STRENGTI! 28 3000
Remarks:
Respectfully submitted,