Loading...
CF-Andrew Park 2-LR 921019 (5)ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 CONCRETE ,TEST,,.REPORT Project: Andrew Brown Park Date Sampled: 10/19/92 Client: Tony Crawford Construction Our Report No.: 25-02-92-06928-23 Field Test Data Location of Pour when Sampled: 300' NORTH OF PARKWAY BLVD., WEST HALF OF DRIVEWAY Unit Weight (C-138) Supplier/Plant TXi #31 Sampled By SCOTY BERRY Delivery Ticket No. 40956 Time: Batched 7:53 AM Sampled 8:15 AM Truck Number 23 Load Size 10.0 Temperature: Air 62°F . Concrete 78°F Mix ID No. 8272, 3000 psi Slump: 5.0 in. Air Content % Waler Added on Site 10, . (C-143) (C-173/C-231) cu. yds. Gals. Strentth Test Results (C-39) Typ* Specimens: CYLINDERS Area: 28.27 in2 l~am Test Dam (C-78) Lab Type Da~ Age. Failure Su'~ng~h. Avg Avg Span. Sp~:ial No. Curing Teated Days Load, lbs. PSI Widlh. in. L~pth. in. Preparatio~ in. 1-1271 LAB 10-26 7 62.000 2190 1-1272 [.All l 1-16 28 1-1273 LAB 11-16 28 1274 LAB 11-16 H SPECIFIED STRENGTI! 28 3000 Remarks: Respectfully submitted,