CF-Andrew Park 2-LR 921015 (2)ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
CONCRETE TEST. REPORT
Project: Andrew Brown Park
Date Sampled: 10/15/92
Client: Tony Crawtbrd Construction
Our Report No.: 25-02-92-06928-20
Field Test Data
Location of Pour when Sampled: 100' NORTH OF PARKWAY ST., CENTER OF DRIVEWAY
Unit Weight (C-138) Supplier/Plant TXI #31
Sampled By ! Delivery Ticket No. 40166
Time: Batched 7:51 AM Sampled 8:30 AM Truck Number 227 Load Size
Temperature: Air 74°F Concrete 78°F Mix ID No. 8272
Slump: 5 in. Air Content % Water Added on Site $.0
(C - ! 43) (C - ! 73/C -23 !)
10.0
cu. yds.
Gals.
Strength Test Results
(C-39)
Type Speehnens: CYLI]qDERS Area: 28.27 in? Beam Test Data (C-78)
Lab Type Date Age. Failure ~rength. Avg Avg Span. Special
No. Curing Tested Days Load. lbs. PSI Width. in. Depth. in. Preparation
in.
1 - 1188 LA B 10-22 7 87.(~Y0 3080
1-1199 LAB 11-22 28
1-1200 [.AB l 1-22 H
LAB
SPECIFIED STRI~NGTI l 28 3000
Remarks:
Respectfully submitted,