Loading...
CF-Andrew Park 2-LR 921015 (2)ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 CONCRETE TEST. REPORT Project: Andrew Brown Park Date Sampled: 10/15/92 Client: Tony Crawtbrd Construction Our Report No.: 25-02-92-06928-20 Field Test Data Location of Pour when Sampled: 100' NORTH OF PARKWAY ST., CENTER OF DRIVEWAY Unit Weight (C-138) Supplier/Plant TXI #31 Sampled By ! Delivery Ticket No. 40166 Time: Batched 7:51 AM Sampled 8:30 AM Truck Number 227 Load Size Temperature: Air 74°F Concrete 78°F Mix ID No. 8272 Slump: 5 in. Air Content % Water Added on Site $.0 (C - ! 43) (C - ! 73/C -23 !) 10.0 cu. yds. Gals. Strength Test Results (C-39) Type Speehnens: CYLI]qDERS Area: 28.27 in? Beam Test Data (C-78) Lab Type Date Age. Failure ~rength. Avg Avg Span. Special No. Curing Tested Days Load. lbs. PSI Width. in. Depth. in. Preparation in. 1 - 1188 LA B 10-22 7 87.(~Y0 3080 1-1199 LAB 11-22 28 1-1200 [.AB l 1-22 H LAB SPECIFIED STRI~NGTI l 28 3000 Remarks: Respectfully submitted,