Loading...
CF-Andrew Park 2-LR 921029ATEC Associat~es, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 CONCRETE REPORT Project: Andrew Brown Park Date Sampled: 10/29/92 Client: Tony Crawford Construction Our Report No.: 25-02-92-06928-29 Field Test Data Location of Pour when Sampled: Paving, north end of parking lot, first 113 of circle Unit Weight (C-138) Supplier/Plant TXI Sampled By ~;COTT BERRY Delivery Ticket No. 4419~1 Time: Batched 11;tl Snmpled 11:55 Truck Number 206 Load Size 10.0 cu. yds. Temperature: Air 77°F Concrete 82°F Mix ID No. 8272, 3000 Slump: 4 in. Air Content % Water Added on Site 10 Gals. (C~143) (C-173/C-231) Strength Test Results Type Specimens: CYLINDERS A~w: 28.27 in? Beam Test Data (C-78) Lab Type Date Age. Failure Stre~th, Avg Ax[ Span, Special No. Curing Tested Days Load, lbs. PSI Width, in. Depth, in. Preparation in. 1 - 1545 LAB 11-4 7 93,000 3290 1-1546 LAB 11-25 28 1-1547 LAB 11-25 28 1-1548 LAB 11-25 H SPECIFIED STRENGTH 28 3000 Remarks: Respectfully submitted,