Loading...
Denton Co Levee-PT001012JI ■ with A BeautLW Future CONSTRUCTION DEVELOPMENT PERART APPLICATION 1. Name of Applicant: Denton County Levee Improvement T)i.-,I-rict No. 1 Address: C/o Carter & Burgess, Inc. 7950 Elmbrook Dallas Texas 75247 Phone Number: 214-638-0145 2. Location of Consti Vista Ridge Subdivision Or: BBB & CRR Su'. Survey /Abstract d Location descrint (address) : L 1 Section g Block # Lot a ay, Abstract 144 Acreage (attach vicinity map): See Attached Plans 3. Type of proposed cc nstruction or development: ( ) Residential () Alteration of a natural waterway drainage course () Non - residential Other (describe & attach drawing or sketch) See Attached Plans ( ) Placement of Fill in right -of -way or on private property) 4. Description of Conn ( ) Paving ( ) Sidewalk ( ) Drive Approach ( ) Excavation ( ) Fire Lane ( ) Bridge • Please provide the under this general :ruction Permit requested: ( ) Median or Landscaping () Box Culvert ( ) Water Main O Rip Rap ( ) R.C.P. () Fill Area ( ) Sanitary Sewer Main ( Drainage Channel Excavation ( ) Flume () Slope Protection Retaining Wall ( ) Inlet () Parking Lot ie, address and 24 hour phone number for supervisor of every contractor working tit. See Attached Project Contact Sheet Revised 3199 CONSTRUCTION DEVEL PERMIT APPLICATION Page 2 5. All construction sh 1 follow the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscap Plan and stamped approved plans. The activity shall be in compliance with Erosion and Sedim ntation Ordinance. 6. Applicant shall pro ide one copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculations. 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning vork. 1' Amount Paid )VIA Date Paid NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way of approved by the City Engineer. Signature of A Is the fill area If yes, then a begin. Is additional Are other federal, (/PERM ( ) PERM Approval Forms /permits /constdev 6 t- Date FOR CITY USE ONLY in an identified flood hazard area? (/Yes ( ) No ►lain Development Permit is required before any construction can required? ate or local permits required? APPLICATION APPROVED APPLICATION DISAPPROVED ( ) Yes (/No ( ) Yes ( ) No / 9hzJod Date Carter n Burgess PROJECT CONTACT LIST NCE DREDGING OF DENTON CREEK FLOOD CONTROL CHANNEL DCLID 1 September 14, 2000 PROJECT MOBIL RESPONSIBILITY CONTACT PHONE PHONE FAX Project Engineer Burt Weathersbee 214 - 638 -0145 214 - 356 -1973 214 - 638 -5632 C &B Project Inspector Lin Lindsey 214 - 638 -0145 214 - 801 -2171 214 - 638 -5632 C &B 800 - 539 -9932 P r Geotechnical Engineer Larry Bracken 214- 630 -9745 214 - 882 -6490 214 - 630 -9819 Rone Engineers Geotechnical Technician TBA Contractor Contact Field - Steve Ablin 817 - 640 -7737 817 - 368 -4832 817 - 640 -0030 Office - John Kolb 817- 946 -4066 DCLID 1 Dick Hightower 214 - 352 -5118 214 - 769 -3297 214 - 352 -8512 Maintenance Supervisor Texas Water Development John Squires 972 - 289 -9890 972-289 -9891 Board Inspector 99207801. M09.doc MAINTENANCE DREDGING OF DENTON CREEK FLOOD CONTROL CHANNEL BID TAB 30- JUNE -00 99207801/Tab6 -30 ENGINEER ESTIMATE S.J. LOUIS SOUTHWIND PAULA CONSTRUCTION CRAIG OLDEN INC. JEFF NOE INC. MCALESTER CONSTRUCTION " EARTH BUILDERS AUSTIN FILTER SYSTEMS Item No. Description �Oty. Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization 1 ILS $ 150,000.00 $ 150,000.00 $ 95,000.00 $ _ 95,000.00 $ 291,486.00 291,486.00 1 $ 20,000.00 $ 20,000.00 $ 209,000.00 $ 209,000.00 $ 90,000.00 $ 90,000.00 $ 60,000.00 $ 60,000.00 $ 80,000.00 $ 80,000.00 $ 121,500.00 $ 121,500.00 2 Clearing, Grubbing and Stripping - Disposal Site 1 LS $18,000 $ 18,000.00 $ 92,000.00 $ 92,000.00 $ 58,650.00 58,650.00 $ 1.00 $ 1.00 $ 75,000.00 E 75,000.00 $ 25,000.00 $ 25,000.00 $20,000.00 $ 20,000.00 $ 145,000.00 $ 145,000.00 $ 180,000.00 $ 180,000.00 _ _ 3 .Vegetation Mowing 1 LS $10,000.00 $ 10,000.00 $ 7,500.00 $ 7,500.00 $ 15,797.00 15,797.00 $ 1.00 $ 1.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 20,000.00 $ 20,000.00 $ 45,000.00 $ 45,000.00 $ 50,000.00 $ 50,000.00 _ 4 'Clearing and Grubbing -Area 1 _ 1 LS $37,500.00 $ 37,500.00 $ 15,000.00 T _ $ _ 15,000.00 $ 8,970.00 8,970.00. $ 142,000.00: $ 142,000.00 $ 45,000.00 $ 45,000.00 $ 50,000.00 $ 50,000.00 $ 30,000.00 $ 30,000.00 $ 55,000.00 _ $ 55,000.00 $ 30,000.00 E 30,000.00 _ 5 Clearin , Grubbing and Stripping - Area 2_ 1 LS 537,500.00 $ 37,500.00 E 25,000.00 E 25,000.00 $ 33,235.00 33,235.00 $ 93,000.00 $ 93,000.00 $ 55,000.00 $ 55,000.00 $ 50,000.00 $ 50,000.00 $ 30,000.00 $ 30,000.00 $ 125,000.00 _ $ 125,000.00 $ 52,000.00 $ 52,000.00 6 Dredging - Area 1 and 2 106 500 CY S 10.11 $ 1 078 715.00 $ 7.70 $ 820 050.00 $ 8.26 666 690.00 $ 8.86 $ 943 590.00 $ 11.40 E 1 214 100.00 S 13.00 � $ 1 384 500 00 14.0 a 0 $ 1,491,000.00 $ 11.50 $ 1,224,750.00' $ 15.95 $ 1,698,675.00 7 Erosion Control Device _ 5,000 LF $1.00 $ 5,0� $ _ 0.95 $ 4,750.00 $ 1.68 8,400.00 $ 0.001 $ 5.00 $ 2.00 $ 10,000.00 $ 2.00 $ 10,000.00 $ 4.00 $ 20,000.00 E 3.DO $ 15,000.00 $ 0.90 $ 4,500.00 _ 8 Construction Entrance __ 1 LS_ $10,000.00 $ 10,000.00 $ 15,000.00 $ 15,000.00 $ 12,412.00 12,412.00 $ 5.001$ 5.00 $_10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 25,000.00 $ 25,000.00 $ 4,500.00 ___.. $ __ 4,500.00 $ 2,000.00 $ 2,000.00 9 Seeding(Hydromulch) 120.000 SY _ 50.70 $ 84,000.00 $ 0.20 $ 24,000.00 $ 0.52 62,400.00 $ 0.001 1 $ 120.00 $ __ 0.40 $ 48,000.00 $ 0.40 $ 48,000.00 $ 0.208 $ 25,000.00 $ 0.60 $ 72,000.00 i , $ 0.40 $ 48,000.00 TOTAL BASE BID $ 1,428,715.00 $ 1 098 300.00 1,158,040.00 $ 1,198,722.00 $ 1 671 100.00 $ 1,677,600.00 $ 1,721,000.00 $ 1,766,250.00 $ 2,186,675.00 McAlester turned in a bid of $25,000 for Seedin H romulch without slating whether the $25,000 was a unit cost or the total cost for the item In the preparation of this bid tabulation 0 was assumed that the $25,000 bid was the total for the item and the total amount bid for the proiect did not change. Asa result a unit bid price was calculated based on the total bid for the item and the quantity in the item. 99207801/Tab6 -30