CF-Andrew Park 2-LR 921021ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
CONCRETE TEST REPORT
Project: Andrew Brown Park
Date Sampled: 10/21/92
Client: Tony Crawford Construction
Our Report No.: 25-02-92436928-25
Field Test Data'
Location of Pour when Sampled: Paving slab, 41' E. & $5' N. of S.W. corner of West Parking area
Unit Weight (C-138) Supplier/Plant TXI ~31
Sampled By SCOTT BERRY Delivery Ticket No. 41685
Tune: Bntched 8:15 AM Sampled ~;05 AM Truck Number 203 Load Size ,,,
Temperature: Air ~F Concre~. 74~F Mix ID No. 8272, 3000 P.S.L
Slump: 4 in. Air Content 5.0 % Water Added on Site O
(C-143) (C-173/C-231)
10 cu. yds.
Gals.
Strength Test Results
(c-:~)
Type ~n~imens: CYLINDEI~ Area: 28.27 in? Beam Test DMa (C-Tg)
Lab Type Date Age. Failure Strength, Avg AvI ~nn, Special
No. Curing Teated Days Load, lbs. PSI Widlh, in. Deplh, in. Preparation
in.
1-1~45 LAB 10-28 7 86,500 3060
1-1346 LAB 11-15 28
!-1347 LAB 11-18 28
2-1348 LAB 11-18 H
SPEC~ 8TRF2~G~ll 28 ~000
Remarks:
Respectfully submitted,