Denton Co Levee-CS 921116November 16, 19190
TO: /Steven
FROM: ✓ M. Sho
RE: Denton
Counci
Docume
Distri
We received a c
study report fc
Per staff's to
Burgess, he ha
concerning the
we have not rec
I will provide
let me know if
COPPELL PUBLIC WORKS
MEMORANDUM
FILE COPY
. Goram, Director of Public Works ^/� / /j�
a Daneshmand, Acting City Engineer >1G ---
ounty Levee Improvement District:
an Robertson's Inquiry 10/9/90 plus
ation of Reclamation of Improvement
py of the above referenced floodplain reclamation
Vista Ridge (see attached).
!phone conversation with Phil Deaton of Carter &
indicated that a letter has been mailed to us
rying up of Denton Creek, however as of this date
ived said letter.
a copy of Phil's response upon receipt. Please
have any questions.
Next Check Date: November 20, 1990.
MSD /sm
O�7CARTER & BU GESS,INC.
ENGINEERS • PLANNE S- SURVEYORS
1100 MACON STREET / FORT WORTH, TEXAS 76102 / (017) 335 -2611
1225 NORTH 1001' WEST / SUITE: 500 / HOUSTON, T XAS 770011/ (713) 1169 -79()()
1 I 7950 1.1M13ROOK URIVL / SUITE 250 / DALLAS, TE AS 75247 / (214) 6311 -0145
TO
O.O
I/
ATTENTION:.
WE ARE SEN ING YOU:
Herewith
❑ Under separate cover
❑ Messenger
❑ Mail
THE FOLLOWING:
❑ Original tracin
❑ Reproducibles
LETTER OF MRANK EMU �TrTr/M-
DATE JOB NO.
RE:
❑ In accordance with your request
❑ Blueprinter
❑ Receipt and return duplicate
to Carter & Burgess, Inc.
❑ Prints
❑ Specifications
❑ Carrier
El
❑ Copy of letter
❑ Other
NO. OF
COPIES
DATE
DRAWING
NO.
DESCRIPTION
C
a `'Vln
THESE ARE TRANSMITTED AS C ECKED BELOW:
❑ For approval ❑ Furnish as submitted
❑ For your use ❑ Furnish as corrected
x'l For your information ❑ Returned for corrections
❑ For review and comme t ❑ Submit specified item
❑ FOR BIDS DUE
REMARKS
COPIES TO:
❑ Revise and resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
19 ❑ PRINTS RETURNED AFTER LOAN TO US
SENT BY:
If enclosures are not as noted, kindly notify us at once.
DANNEINBAUM ENGIIIJEE RING CORPORATION
C;C)H (ii_rirdG FNGINEERS
�F—Ir, W. Moc Kir�r, Fii rz o, Suirf, 3000, DALLAS, TEXA7, 752:35
ni,rn (.,,1,,
March 13, 1985
Hr. Tom Dingler
re('Lor of Public W1
West Church
rrks
I.—wisvi Ile, Texas 7{-)O61
H-: ( ;,d.oway Developinllerrt
Mr. Uingler:
Ill- proposed Gateway Ue,veloollent; in southeast Lewisville will include the
clrannr�l ization of Denton Creek an (.I reclamation of flood plain land by
r;(Inst:ruct:ior) of 1 ev ees and l) lacem_nt: of earth fill. These proposed
ifill) rovements will require that the Denton Creek f loodway, as currently
e,tabIished by the Federal Emergency Management Agency (FEMA) , be revised.
l.)etailed hydraulic studies of U nton Creek for existing and proposed
('Miditions have been conducted by Dannenbaum Engineering Corporation. The
r-l:ults of these studies are presented in our report titled Flood Plain
Reclamation Study on Denton Creek for, Proposed Letter of Mrap Revision. With
T- -- _—'i— - - - - - -- - —
Iit(' submrttaT of trr�s report. we are asking that you request a letter of map
rr>✓rsion from FEMA for, Denton Creek. We understand that this report can be
su��mi t.;terl to FEiIMA in support of the re lrrest.
If you have any qirestions concernitrq this matter, please call.
Sincerely,
L)�1flfdt:tVf?llllfal� FNhiPJEEit1fJG CORPORATION
I'hi I 1.leaton, P.E.
Project Manager
I
i3 _013