CF-Andrew Park 2-LR 921021 (2)ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
CONCRETE TEST REPORT
Project: Andrew Brown Park
Client: Tony Crawford Construction
Date Sampled: 10/21/92
Our Report No.: 25-02-92-06928-25A
Field Test Data
Location of Pour when Sampled: Light Pole bases
Unit Weight (C-138)
Sampled By SCOTT BERRY
Time: Batched 10:11 AM Sampled ~I~1;10 AM
Temperature: Air 7Q°F Concrete 7~F
Slump: 4.25 in. Air Content 4,5
(C-143) (C-173/C-231)
Supplier/Plant TXI #31
Delivery Ticket No. 4H;7~
Truck Number ]~ Load Sim I0 cu. yds.
Mlz ID No. 8272. 3000 P.S.L
% Water Added on Site lq Gals.
Strength Test Results
(C-39)
Type Specimens: CYLINDERS Area: 28.27 in? Beam Test Data
L~b Type Dat~ Age. Failuro $trmgth, Avg Avg $p~m, Sl~c~l
No. Curing Tested Days Load, lbs. PSI Wid~d~, in. D~h, in. Prcparatlott
in.
2-1~49 LAB 10-28 7 84,000 2970
2-1350 LAB 11-18 28
2-1351 LAB 11-18 28
2-1352 LAB 11-18 H
$1~CI~ED 8TRENGTll 28 3000
Remarks:
Respectfully submitted,